Sábháilte in:
| Príomhchruthaitheoirí: | Mirnezami, Seyed-Ali, Ghasemi, Mohammad, Shahabi-Shahmiri, Reza |
|---|---|
| Formáid: | Preprint |
| Foilsithe / Cruthaithe: |
2025
|
| Ábhair: | |
| Rochtain ar líne: | https://arxiv.org/abs/2509.00002 |
| Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Míreanna comhchosúla
A Bi-Objective Mathematical Model for the Multi-Skilled Resource-Constrained Project Scheduling Problem Considering Reliability: An AUGMECON2VIKOR Hybrid Method
de réir: Ghasemi, Mohammad, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Ghasemi, Mohammad, et al.
Foilsithe / Cruthaithe: (2025)
Optimizing Perishable and Non-Perishable Product Assignment to Packaging Lines in a Sustainable Manufacturing System: An AUGMECON2VIKOR Algorithm
de réir: Shahabi-Shahmiri, Reza, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Shahabi-Shahmiri, Reza, et al.
Foilsithe / Cruthaithe: (2024)
Computing the l,k-Clique Metric Dimension of Graphs via (Edge) Corona Products and Integer Linear Programming Model
de réir: Zeinab Shahmiri, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Zeinab Shahmiri, et al.
Foilsithe / Cruthaithe: (2024)
Conversion of one anastomosis gastric bypass to distal Roux‐en‐Y gastric bypass due to recurrent weight gain and gastroesophageal reflux disease: A video case report
de réir: Mohammad Kermansaravi, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Mohammad Kermansaravi, et al.
Foilsithe / Cruthaithe: (2024)
Concurrency Constrained Scheduling with Tree-Like Constraints
de réir: Bodlaender, Hans L., et al.
Foilsithe / Cruthaithe: (2025)
de réir: Bodlaender, Hans L., et al.
Foilsithe / Cruthaithe: (2025)
A Multi-Objective Genetic Algorithm for Healthcare Workforce Scheduling
de réir: Patel, Vipul, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Patel, Vipul, et al.
Foilsithe / Cruthaithe: (2025)
Bi-Objective Evolutionary Optimization for Large-Scale Open Pit Mine Scheduling Problem under Uncertainty with Chance Constraints
de réir: Pathiranage, Ishara Hewa, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Pathiranage, Ishara Hewa, et al.
Foilsithe / Cruthaithe: (2025)
Flow Subgraphs and Flow Network Design under End-to-End Power Dissipation Constraints
de réir: Qiu, Zhihao, et al.
Foilsithe / Cruthaithe: (2026)
de réir: Qiu, Zhihao, et al.
Foilsithe / Cruthaithe: (2026)
Project Basic. Instructional Resources for Mathematics.
Foilsithe / Cruthaithe: (1982)
Foilsithe / Cruthaithe: (1982)
A Numerical Technique for Coupling the Momentum and the Continuity Equations for Semi-Implicit 3D Ocean Models
de réir: Shahabi, Ali, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Shahabi, Ali, et al.
Foilsithe / Cruthaithe: (2024)
Improving the Robustness of the Projected Gradient Descent Method for Nonlinear Constrained Optimization Problems in Topology Optimization
de réir: Barbeau, Lucka, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Barbeau, Lucka, et al.
Foilsithe / Cruthaithe: (2024)
Constrained Flows in Networks
de réir: Bessy, Stéphane, et al.
Foilsithe / Cruthaithe: (2023)
de réir: Bessy, Stéphane, et al.
Foilsithe / Cruthaithe: (2023)
Parallel Machine Scheduling of Deteriorating Jobs With Rejection and An Availability Constraint
de réir: Guanghua Wu, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Guanghua Wu, et al.
Foilsithe / Cruthaithe: (2025)
A Parametrized Complexity View on Robust Scheduling with Budgeted Uncertainty
de réir: Goldberg, Noam, et al.
Foilsithe / Cruthaithe: (2026)
de réir: Goldberg, Noam, et al.
Foilsithe / Cruthaithe: (2026)
Cash-subadditive risk measures without quasi-convexity
de réir: Han, Xia, et al.
Foilsithe / Cruthaithe: (2021)
de réir: Han, Xia, et al.
Foilsithe / Cruthaithe: (2021)
Singular Control in a Cash Management Model with Ambiguity
de réir: Archankul, Arnon, et al.
Foilsithe / Cruthaithe: (2023)
de réir: Archankul, Arnon, et al.
Foilsithe / Cruthaithe: (2023)
Output-sensitive Complexity of Multi-Objective Integer Network Flow Problems
de réir: Könen, David, et al.
Foilsithe / Cruthaithe: (2023)
de réir: Könen, David, et al.
Foilsithe / Cruthaithe: (2023)
Bottleneck Identification in Resource-Constrained Project Scheduling via Constraint Relaxation
de réir: Nedbálek, Lukáš, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Nedbálek, Lukáš, et al.
Foilsithe / Cruthaithe: (2025)
Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty using Graph Neural Networks
de réir: Infantes, Guillaume, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Infantes, Guillaume, et al.
Foilsithe / Cruthaithe: (2025)
A Scalable Lift-and-Project Differentiable Approach For the Maximum Cut Problem
de réir: Alkhouri, Ismail, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Alkhouri, Ismail, et al.
Foilsithe / Cruthaithe: (2025)
Resource Marginal Problems
de réir: Hsieh, Chung-Yun, et al.
Foilsithe / Cruthaithe: (2022)
de réir: Hsieh, Chung-Yun, et al.
Foilsithe / Cruthaithe: (2022)
The Days On Days Off Scheduling Problem
de réir: Nießen, Fabien, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Nießen, Fabien, et al.
Foilsithe / Cruthaithe: (2024)
Learning-Based Approaches for Job Shop Scheduling Problems: A Review
de réir: Rihane, Karima, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Rihane, Karima, et al.
Foilsithe / Cruthaithe: (2025)
Flow Shop Scheduling with Inter-Stage Flexibility and Blocking Constraints
de réir: Nicosia, Gaia, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Nicosia, Gaia, et al.
Foilsithe / Cruthaithe: (2024)
Flow Shop Scheduling with Stochastic Reentry
de réir: von Aspern, Maximilian, et al.
Foilsithe / Cruthaithe: (2026)
de réir: von Aspern, Maximilian, et al.
Foilsithe / Cruthaithe: (2026)
A Solution Matrix by IEVP under the Central Principle Submatrix Constraints
de réir: Vineet Bhatt, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Vineet Bhatt, et al.
Foilsithe / Cruthaithe: (2024)
Left-Right Relative Entropy
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2024)
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2024)
Optimal Trading of a Charging-Station Company in Auction Markets for Electricity
de réir: Sohrabi, Farnaz, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Sohrabi, Farnaz, et al.
Foilsithe / Cruthaithe: (2025)
Finding Pure Nash Equilibrium for the Resource-Constrained Project Scheduling Problem
de réir: Guillermo De Ita Luna
Foilsithe / Cruthaithe: (2015)
de réir: Guillermo De Ita Luna
Foilsithe / Cruthaithe: (2015)
A Novel Algorithm and Its Convergence Analysis for Solving the Generalized Split Inverse Problem
de réir: Mohammad Eslamian
Foilsithe / Cruthaithe: (2025)
de réir: Mohammad Eslamian
Foilsithe / Cruthaithe: (2025)
Optimizing E‐Commerce Selection Under Uncertainty: A New Framework for Decision‐Making With Extended Fuzzy TOPSIS
de réir: Jency Leona Edward, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Jency Leona Edward, et al.
Foilsithe / Cruthaithe: (2024)
Optimal control in reducing side effects during and after chemotherapy of solid tumors
de réir: Zeinab Joorsara, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Zeinab Joorsara, et al.
Foilsithe / Cruthaithe: (2024)
Integrating Physics of the Problem into Data-Driven Methods to Enhance Elastic Full-Waveform Inversion with Uncertainty Quantification
de réir: Negahdari, Vahid, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Negahdari, Vahid, et al.
Foilsithe / Cruthaithe: (2024)
A Note on Anti‐De Sitter Spaces as G ‐Manifolds
de réir: Jafar Ebrahimi, et al.
Foilsithe / Cruthaithe: (2025)
de réir: Jafar Ebrahimi, et al.
Foilsithe / Cruthaithe: (2025)
A Smooth Penalty Function Algorithm for Computing Nonlinear Inequality Constraint Optimization Problem
de réir: Dharminder Singh, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Dharminder Singh, et al.
Foilsithe / Cruthaithe: (2024)
Global Minimality in Constrained Inverse Source Problems for Complex Electromagnetic Media
de réir: Khodja, M. R.
Foilsithe / Cruthaithe: (2018)
de réir: Khodja, M. R.
Foilsithe / Cruthaithe: (2018)
Defect relative entropy in symmetric orbifold CFTs
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2026)
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2026)
Defect Relative Entropy
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2026)
de réir: Ghasemi, Mostafa
Foilsithe / Cruthaithe: (2026)
Branch and Price for the Length-Constrained Cycle Partition Problem
de réir: Ghannam, Mohammed, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Ghannam, Mohammed, et al.
Foilsithe / Cruthaithe: (2024)
Extended Deep Submodular Functions
de réir: Hosseini, Seyed Mohammad, et al.
Foilsithe / Cruthaithe: (2024)
de réir: Hosseini, Seyed Mohammad, et al.
Foilsithe / Cruthaithe: (2024)
Míreanna comhchosúla
-
A Bi-Objective Mathematical Model for the Multi-Skilled Resource-Constrained Project Scheduling Problem Considering Reliability: An AUGMECON2VIKOR Hybrid Method
de réir: Ghasemi, Mohammad, et al.
Foilsithe / Cruthaithe: (2025) -
Optimizing Perishable and Non-Perishable Product Assignment to Packaging Lines in a Sustainable Manufacturing System: An AUGMECON2VIKOR Algorithm
de réir: Shahabi-Shahmiri, Reza, et al.
Foilsithe / Cruthaithe: (2024) -
Computing the l,k-Clique Metric Dimension of Graphs via (Edge) Corona Products and Integer Linear Programming Model
de réir: Zeinab Shahmiri, et al.
Foilsithe / Cruthaithe: (2024) -
Conversion of one anastomosis gastric bypass to distal Roux‐en‐Y gastric bypass due to recurrent weight gain and gastroesophageal reflux disease: A video case report
de réir: Mohammad Kermansaravi, et al.
Foilsithe / Cruthaithe: (2024) -
Concurrency Constrained Scheduling with Tree-Like Constraints
de réir: Bodlaender, Hans L., et al.
Foilsithe / Cruthaithe: (2025)