Uloženo v:
| Hlavní autoři: | Bangladesh, Power Grid Corporation of, Ministry of Power, Energy and Mineral Resources, Bangladesh, Government of the People's Republic of |
|---|---|
| Médium: | Recurso digital |
| Jazyk: | |
| Vydáno: |
Zenodo
2017
|
| Témata: | |
| On-line přístup: | https://doi.org/10.5281/zenodo.17280802 |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
Podobné jednotky
Figure 4.16 in Environmental Impact Assessment (EIA) for the Feasibility Study of Enhancement and Strengthening of Power Network in Eastern Region (ESPNER) of Bangladesh
Autor: Bangladesh, Power Grid Corporation of, a další
Vydáno: (2017)
Autor: Bangladesh, Power Grid Corporation of, a další
Vydáno: (2017)
AERONYXEL: Advanced Stealth Object Detection Radar System with Sensor Fusion and AI
Autor: The People's University of Bangladesh
Vydáno: (2025)
Autor: The People's University of Bangladesh
Vydáno: (2025)
Reuse of untreated reactive dyeing wastewater for reactive coloration of cotton
Autor: Northern University Bangladesh
Vydáno: (2025)
Autor: Northern University Bangladesh
Vydáno: (2025)
SCIPE: A Hybrid Framework for Measuring the Quality of Life in Low-Resource Countries Aligning with the Objectives of SDGs
Autor: Data and Design Lab, Bangladesh
Vydáno: (2026)
Autor: Data and Design Lab, Bangladesh
Vydáno: (2026)
Memorandum of the ministry of foreign affairs of the democratic people's Republic of Korea
Autor: Korea (Democratic People's Republic)
Vydáno: (1962)
Autor: Korea (Democratic People's Republic)
Vydáno: (1962)
Table 8 - 2 in Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Figure 7-2 in Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Table 6 - 16 in Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Figure 7-3 in Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Autor: GmbH, Gopa-International Energy Consultants, a další
Vydáno: (2022)
Ministry of Fisheries and Marine Resources Namibia, Annual report 2004
Autor: Ministry of Fisheries and Marine Resources
Vydáno: (2004)
Autor: Ministry of Fisheries and Marine Resources
Vydáno: (2004)
Fig. 1 in Habitat preferences of young-of-year spotted gar (Lepisosteus oculatus) in Rondeau Bay, Lake Erie
Autor: McAllister, Keith, a další
Vydáno: (2023)
Autor: McAllister, Keith, a další
Vydáno: (2023)
Table 99 in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Table 91 in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Figure 76 in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Table 83 in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Figure 83 in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Figure 55. E1.2E in Divriği-Kars-Georgia Border Railway Line Rehabilitation and Modernization Project
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
Autor: T. C. Ministry of Transport and Infrastructure Directorate General of Infrastructure Investments
Vydáno: (2024)
F I G U R E 1 in Active feeding of downstream migrating juvenile pink salmon (Oncorhynchus gorbuscha) revealed in a large Barents Sea river using diet and stable isotope analysis
Autor: Erkinaro, Jaakko, a další
Vydáno: (2023)
Autor: Erkinaro, Jaakko, a další
Vydáno: (2023)
Figure-2.1. Steps Involved in Environmental Clearance in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
Autor: NEWAZ, M. N.
Vydáno: (2010)
Autor: NEWAZ, M. N.
Vydáno: (2010)
Table 9 in Environmental Impact Assessment Of The S. Vicente Wind Farm On The Tarentola Caboverdiana Substituta Gecko - Final Report
Autor: Vasconcelos, R, a další
Vydáno: (2010)
Autor: Vasconcelos, R, a další
Vydáno: (2010)
Table 4 - 3 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Table 7 - 5 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Table 6 - 12 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Figure 2-15 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Figure 6-7 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Table 4 - 2 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Figure 6-5 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
Autor: McAlister, Greg, a další
Vydáno: (2020)
Autor: McAlister, Greg, a další
Vydáno: (2020)
Table 1 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
Autor: NEWAZ, M. N.
Vydáno: (2010)
Autor: NEWAZ, M. N.
Vydáno: (2010)
P in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Table 4.10 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
Autor: NEWAZ, M. N.
Vydáno: (2010)
Autor: NEWAZ, M. N.
Vydáno: (2010)
Tabla 5.32 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500 KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Figura 5.91 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Figura 5.43 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Tabla 5.5 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500 KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Foto 5.31 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Foto 5.56 in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Table- 1.3. List of Reptiles in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
Autor: NEWAZ, M. N.
Vydáno: (2010)
Autor: NEWAZ, M. N.
Vydáno: (2010)
Table- 1.4. List of Amphibians in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
Autor: NEWAZ, M. N.
Vydáno: (2010)
Autor: NEWAZ, M. N.
Vydáno: (2010)
Power12223313/-CAACTSA: CAACTSA CODE
Autor: Power12223313
Vydáno: (2025)
Autor: Power12223313
Vydáno: (2025)
Tabla 5.6 Volumen total y comercial, biomasa y in ESTUDIO DE IMPACTO AMBIENTAL (EIA) DEL PARQUE SOLAR FOTOVOLTAICO GUAYEPO III 200 MW Y SU LÍNEA DE EVACUACIÓN 500 KV
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Autor: Beltrán, Gilmer, a další
Vydáno: (2022)
Podobné jednotky
-
Figure 4.16 in Environmental Impact Assessment (EIA) for the Feasibility Study of Enhancement and Strengthening of Power Network in Eastern Region (ESPNER) of Bangladesh
Autor: Bangladesh, Power Grid Corporation of, a další
Vydáno: (2017) -
AERONYXEL: Advanced Stealth Object Detection Radar System with Sensor Fusion and AI
Autor: The People's University of Bangladesh
Vydáno: (2025) -
Reuse of untreated reactive dyeing wastewater for reactive coloration of cotton
Autor: Northern University Bangladesh
Vydáno: (2025) -
SCIPE: A Hybrid Framework for Measuring the Quality of Life in Low-Resource Countries Aligning with the Objectives of SDGs
Autor: Data and Design Lab, Bangladesh
Vydáno: (2026) -
Memorandum of the ministry of foreign affairs of the democratic people's Republic of Korea
Autor: Korea (Democratic People's Republic)
Vydáno: (1962)