Uloženo v:
| Hlavní autor: | |
|---|---|
| Médium: | Recurso digital |
| Jazyk: | angličtina |
| Vydáno: |
Zenodo
2026
|
| Témata: | |
| On-line přístup: | https://doi.org/10.5281/zenodo.20124577 |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
Obsah:
- A short, fast-running diagnostic companion to the Operator Playbooks volume on lean operations. Eliminate waste before adding capacity. The leak shows up not in one bad week but in the absence of a weekly rhythm that catches the seven wastes, surfaces 5S drift, and captures kaizen signals before they become capacity requests no one questioned. A six-question diagnostic intake routes the reader to the right starting tool based on which leg of the lean discipline is leaking fastest. The three tools, in order most operators run them after the diagnostic: **Daily Seven-Waste Spot-Check.** Twenty minutes a week walking the operation and naming the seven wastes (overproduction, waiting, transport, over-processing, inventory, motion, defects) where they actually appear. Two worked examples: a B2C consumer packaging operator running spot-checks on a packaging line, and a B2B leather goods workshop catching custom-order rework as a defect waste. **5S Weekly Workplace Audit.** A weekly walk-through scoring the operation against Sort, Set in Order, Shine, Standardize, Sustain. Two worked examples: an auto-parts distributor running 5S across a multi-bay warehouse, and a Solo garment finishing workshop running 5S on a fabric-handling floor with high-mix production. **Kaizen Suggestion Log.** Five minutes per week capturing improvement signals from the floor. Two worked examples: a garment finishing workshop running a structured suggestion process, and a Semarang commercial printing shop running B2B service kaizen. Each tool carries a self-scoring rubric, a quick decision tree, and tier adaptations for single-owner shops, mid-tier businesses, and pre-IPO operations. A thirty-day plan at the back sequences the three tools so the rhythm forms without overload. This companion was written from the seat of an operator running businesses in Indonesia. Examples, currency, and texture reflect that origin. The frameworks apply broadly to small and mid-sized businesses in other emerging markets and to many developed-market SME settings. **What this companion does NOT do** - Replace *Lean Operations Principles* (Operator Playbooks 12). - Address quarterly lean recalibration or scenario-triggered lean crises. **Who This Is For** - Operators managing operations without a continuous improvement function. - Owners whose capacity has been added without a waste audit. - Mid-tier directors who want a structured weekly rhythm before approving the next round of capacity expansion. **Topics and Keywords** weekly lean rhythm, seven wastes, 5S audit, kaizen log, waste detection, lean operations, SME continuous improvement, operator playbook companion