Perpetual maintenance of machines with different urgency requirements
Fuente:
arXiv
Gespeichert in:
| Hauptverfasser: | , , , , , , |
|---|---|
| Format: | Preprint |
| Veröffentlicht: |
2022
|
| Schlagworte: | |
| Online-Zugang: | |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| _version_ | 1866914979207184384 |
|---|---|
| author | Gąsieniec, Leszek Jurdziński, Tomasz Klasing, Ralf Levcopoulos, Christos Lingas, Andrzej Min, Jie Radzik, Tomasz |
| author_facet | Gąsieniec, Leszek Jurdziński, Tomasz Klasing, Ralf Levcopoulos, Christos Lingas, Andrzej Min, Jie Radzik, Tomasz |
| contents | A garden $G$ is populated by $n\ge 1$ bamboos $b_1, b_2, ..., b_n$ with the respective daily growth rates $h_1 \ge h_2 \ge \dots \ge h_n$. It is assumed that the initial heights of bamboos are zero. The robotic gardener maintaining the garden regularly attends bamboos and trims them to height zero according to some schedule. The Bamboo Garden Trimming Problem (BGT) is to design a perpetual schedule of cuts to maintain the elevation of the bamboo garden as low as possible. The bamboo garden is a metaphor for a collection of machines which have to be serviced, with different frequencies, by a robot which can service only one machine at a time. The objective is to design a perpetual schedule of servicing which minimizes the maximum (weighted) waiting time for servicing.
We consider two variants of BGT. In discrete BGT the robot trims only one bamboo at the end of each day. In continuous BGT the bamboos can be cut at any time, however, the robot needs time to move from one bamboo to the next.
For discrete BGT, we show tighter approximation algorithms for the case when the growth rates are balanced and for the general case. The former algorithm settles one of the conjectures about the Pinwheel problem. The general approximation algorithm improves on the previous best approximation ratio. For continuous BGT, we propose approximation algorithms which achieve approximation ratios $O(\log \lceil h_1/h_n\rceil)$ and $O(\log n)$. |
| format | Preprint |
| id |
arxiv_https___arxiv_org_abs_2202_01567 |
| institution | arXiv |
| publishDate | 2022 |
| record_format | arxiv |
| spellingShingle | Perpetual maintenance of machines with different urgency requirements Gąsieniec, Leszek Jurdziński, Tomasz Klasing, Ralf Levcopoulos, Christos Lingas, Andrzej Min, Jie Radzik, Tomasz Data Structures and Algorithms A garden $G$ is populated by $n\ge 1$ bamboos $b_1, b_2, ..., b_n$ with the respective daily growth rates $h_1 \ge h_2 \ge \dots \ge h_n$. It is assumed that the initial heights of bamboos are zero. The robotic gardener maintaining the garden regularly attends bamboos and trims them to height zero according to some schedule. The Bamboo Garden Trimming Problem (BGT) is to design a perpetual schedule of cuts to maintain the elevation of the bamboo garden as low as possible. The bamboo garden is a metaphor for a collection of machines which have to be serviced, with different frequencies, by a robot which can service only one machine at a time. The objective is to design a perpetual schedule of servicing which minimizes the maximum (weighted) waiting time for servicing. We consider two variants of BGT. In discrete BGT the robot trims only one bamboo at the end of each day. In continuous BGT the bamboos can be cut at any time, however, the robot needs time to move from one bamboo to the next. For discrete BGT, we show tighter approximation algorithms for the case when the growth rates are balanced and for the general case. The former algorithm settles one of the conjectures about the Pinwheel problem. The general approximation algorithm improves on the previous best approximation ratio. For continuous BGT, we propose approximation algorithms which achieve approximation ratios $O(\log \lceil h_1/h_n\rceil)$ and $O(\log n)$. |
| title | Perpetual maintenance of machines with different urgency requirements |
| topic | Data Structures and Algorithms |
| url | https://arxiv.org/abs/2202.01567 |