Fast construction on a restricted budget

Fuente: arXiv
Guardado en:
Detalles Bibliográficos
Autores principales: Frieze, Alan, Krivelevich, Michael, Michaeli, Peleg
Formato: Preprint
Publicado: 2022
Materias:
Acceso en línea:
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866916493277528064
author Frieze, Alan
Krivelevich, Michael
Michaeli, Peleg
author_facet Frieze, Alan
Krivelevich, Michael
Michaeli, Peleg
contents We introduce a model of a controlled random graph process. In this model, the edges of the complete graph $K_n$ are ordered randomly and then revealed, one by one, to a player called Builder. He must decide, immediately and irrevocably, whether to purchase each observed edge. The observation time is bounded by parameter $t$, and the total budget of purchased edges is bounded by parameter $b$. Builder's goal is to devise a strategy that, with high probability, allows him to construct a graph of purchased edges possessing a target graph property $\mathcal{P}$, all within the limitations of observation time and total budget. We show the following: (a) Builder has a strategy to achieve $k$-vertex-connectivity at the hitting time for this property by purchasing at most $c_kn$ edges for an explicit $c_k<k$; and a strategy to achieve minimum degree $k$ (slightly) after the threshold for minimum degree $k$ by purchasing at most $(1+\varepsilon)kn/2$ edges (which is optimal). (b) Builder has a strategy to create a Hamilton cycle at the hitting time for Hamiltonicity by purchasing at most $Cn$ edges for an absolute constant $C>1$; this is optimal in the sense that $C$ cannot be arbitrarily close to $1$. This substantially extends the classical hitting time result for Hamiltonicity due to Ajtai--Komlós--Szemerédi and Bollobás. (c) Builder has a strategy to create a perfect matching by time $(1+\varepsilon)n\log{n}/2$ while purchasing at most $(1+\varepsilon)n/2$ edges (which is optimal). (d) Builder has a strategy to create a copy of a given $k$-vertex tree if $t\ge b\gg\max\{(n/t)^{k-2},1\}$, and this is optimal; (e) For $\ell=2k+1$ or $\ell=2k+2$, Builder has a strategy to create a copy of a cycle of length $\ell$ if $b\gg\max \{n^{k+2}/t^{k+1},n/\sqrt{t}\}$, and this is optimal.
format Preprint
id arxiv_https___arxiv_org_abs_2207_07251
institution arXiv
publishDate 2022
record_format arxiv
spellingShingle Fast construction on a restricted budget
Frieze, Alan
Krivelevich, Michael
Michaeli, Peleg
Combinatorics
05C80 (Primary) 60C05, 05C45 (Seconday)
We introduce a model of a controlled random graph process. In this model, the edges of the complete graph $K_n$ are ordered randomly and then revealed, one by one, to a player called Builder. He must decide, immediately and irrevocably, whether to purchase each observed edge. The observation time is bounded by parameter $t$, and the total budget of purchased edges is bounded by parameter $b$. Builder's goal is to devise a strategy that, with high probability, allows him to construct a graph of purchased edges possessing a target graph property $\mathcal{P}$, all within the limitations of observation time and total budget. We show the following: (a) Builder has a strategy to achieve $k$-vertex-connectivity at the hitting time for this property by purchasing at most $c_kn$ edges for an explicit $c_k<k$; and a strategy to achieve minimum degree $k$ (slightly) after the threshold for minimum degree $k$ by purchasing at most $(1+\varepsilon)kn/2$ edges (which is optimal). (b) Builder has a strategy to create a Hamilton cycle at the hitting time for Hamiltonicity by purchasing at most $Cn$ edges for an absolute constant $C>1$; this is optimal in the sense that $C$ cannot be arbitrarily close to $1$. This substantially extends the classical hitting time result for Hamiltonicity due to Ajtai--Komlós--Szemerédi and Bollobás. (c) Builder has a strategy to create a perfect matching by time $(1+\varepsilon)n\log{n}/2$ while purchasing at most $(1+\varepsilon)n/2$ edges (which is optimal). (d) Builder has a strategy to create a copy of a given $k$-vertex tree if $t\ge b\gg\max\{(n/t)^{k-2},1\}$, and this is optimal; (e) For $\ell=2k+1$ or $\ell=2k+2$, Builder has a strategy to create a copy of a cycle of length $\ell$ if $b\gg\max \{n^{k+2}/t^{k+1},n/\sqrt{t}\}$, and this is optimal.
title Fast construction on a restricted budget
topic Combinatorics
05C80 (Primary) 60C05, 05C45 (Seconday)
url https://arxiv.org/abs/2207.07251