A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Austgen, Brent, Kutanoglu, Erhan, Hasenbein, John J.
Format: Preprint
Published: 2023
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866916080528654336
author Austgen, Brent
Kutanoglu, Erhan
Hasenbein, John J.
author_facet Austgen, Brent
Kutanoglu, Erhan
Hasenbein, John J.
contents We present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electrical substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed number of mitigation resources, and the second stage captures grid operation in response to a contingency. The primary objective is to minimize expected load shed. We develop methods for simulating flooding induced by extreme rainfall and construct two geographically realistic case studies, one based on Tropical Storm Imelda and the other on Hurricane Harvey. Applying our model to those case studies, we investigate the effect of the mitigation budget on the optimal objective value and solutions. Our results highlight the sensitivity of the optimal mitigation to the budget, a consequence of those decisions being discrete. We additionally assess the value of having better mitigation options and the spatial features of the optimal mitigation.
format Preprint
id arxiv_https___arxiv_org_abs_2302_10996
institution arXiv
publishDate 2023
record_format arxiv
spellingShingle A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane
Austgen, Brent
Kutanoglu, Erhan
Hasenbein, John J.
Optimization and Control
Systems and Control
We present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electrical substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed number of mitigation resources, and the second stage captures grid operation in response to a contingency. The primary objective is to minimize expected load shed. We develop methods for simulating flooding induced by extreme rainfall and construct two geographically realistic case studies, one based on Tropical Storm Imelda and the other on Hurricane Harvey. Applying our model to those case studies, we investigate the effect of the mitigation budget on the optimal objective value and solutions. Our results highlight the sensitivity of the optimal mitigation to the budget, a consequence of those decisions being discrete. We additionally assess the value of having better mitigation options and the spatial features of the optimal mitigation.
title A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane
topic Optimization and Control
Systems and Control
url https://arxiv.org/abs/2302.10996