Salvato in:
Dettagli Bibliografici
Autori principali: Emunds, Tamme, Nießen, Nils
Natura: Preprint
Pubblicazione: 2023
Soggetti:
Accesso online:https://arxiv.org/abs/2309.14351
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866917005505855488
author Emunds, Tamme
Nießen, Nils
author_facet Emunds, Tamme
Nießen, Nils
contents Many infrastructure managers have the goal to increase the capacity of their railway infrastructure due to an increasing demand. While methods for performance calculations of railway line infrastructure are already well established, the determination of railway junction capacity remains a challenge. This work utilizes the concept of queueing theory to develop a method for the capacity calculation of railway junctions, solely depending on their infrastructure layout along with arrival and service rates. The implementation of the introduced approach is based on advanced model-checking techniques. It can be used to decide which infrastructure layout to build, i.e. whether an overpass for the analysed railway junction is needed. The developed method hence addresses the need for fast and reliable timetable independent junction evaluation in the long-term railway capacity calculation landscape.
format Preprint
id arxiv_https___arxiv_org_abs_2309_14351
institution arXiv
publishDate 2023
record_format arxiv
spellingShingle To build or not to build -- A queueing-based approach to timetable independent railway junction infrastructure dimensioning
Emunds, Tamme
Nießen, Nils
Systems and Control
Many infrastructure managers have the goal to increase the capacity of their railway infrastructure due to an increasing demand. While methods for performance calculations of railway line infrastructure are already well established, the determination of railway junction capacity remains a challenge. This work utilizes the concept of queueing theory to develop a method for the capacity calculation of railway junctions, solely depending on their infrastructure layout along with arrival and service rates. The implementation of the introduced approach is based on advanced model-checking techniques. It can be used to decide which infrastructure layout to build, i.e. whether an overpass for the analysed railway junction is needed. The developed method hence addresses the need for fast and reliable timetable independent junction evaluation in the long-term railway capacity calculation landscape.
title To build or not to build -- A queueing-based approach to timetable independent railway junction infrastructure dimensioning
topic Systems and Control
url https://arxiv.org/abs/2309.14351