Power System Resource Expansion Planning

Fuente: arXiv
Saved in:
Bibliographic Details
Main Author: Datta, Sohom
Format: Preprint
Published: 2024
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866911762893242368
author Datta, Sohom
author_facet Datta, Sohom
contents Power System Resource Planning is the recurrent process of studying and determining what facilities and procedures should be provided to satisfy and promote appropriate future demands for electricity. The electric power system as planned should meet or balance societal goals. These include availability of electricity to all potential users at lowest possible cost, minimum environmental damage, high levels of safety and reliability, etc. Plans should be technically and financially feasible. Plans also should achieve the objectives the entity doing the planning, including minimizing risk. The emergence of meta-heuristics has given robustness to the non-analytical methods, because of the rationale behind them. Besides, evolutionary algorithms have provided a higher degree of confidence in a stochastic convergence to optimum and have supported this confidence with a mathematical background explaining not only how they achieve convergence but also how to improve the convergence rate. The present work of analyses and implementation can be divided into: i) Transmission Constrained Generation Expansion Planning (TC GEP), ii) Composite Generation Expansion and Transmission Network Expansion Planning (GEP TNEP), iii) Transmission Network Expansion (TNEP) Planning using AC model, iv) Composite Transmission Network Expansion Planning (TNEP) and Reactive Power Expansion Planning (RPP) and v) Transmission Network Planning using Interior-Point Method (IP TNEP).
format Preprint
id arxiv_https___arxiv_org_abs_2401_12241
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle Power System Resource Expansion Planning
Datta, Sohom
Systems and Control
Power System Resource Planning is the recurrent process of studying and determining what facilities and procedures should be provided to satisfy and promote appropriate future demands for electricity. The electric power system as planned should meet or balance societal goals. These include availability of electricity to all potential users at lowest possible cost, minimum environmental damage, high levels of safety and reliability, etc. Plans should be technically and financially feasible. Plans also should achieve the objectives the entity doing the planning, including minimizing risk. The emergence of meta-heuristics has given robustness to the non-analytical methods, because of the rationale behind them. Besides, evolutionary algorithms have provided a higher degree of confidence in a stochastic convergence to optimum and have supported this confidence with a mathematical background explaining not only how they achieve convergence but also how to improve the convergence rate. The present work of analyses and implementation can be divided into: i) Transmission Constrained Generation Expansion Planning (TC GEP), ii) Composite Generation Expansion and Transmission Network Expansion Planning (GEP TNEP), iii) Transmission Network Expansion (TNEP) Planning using AC model, iv) Composite Transmission Network Expansion Planning (TNEP) and Reactive Power Expansion Planning (RPP) and v) Transmission Network Planning using Interior-Point Method (IP TNEP).
title Power System Resource Expansion Planning
topic Systems and Control
url https://arxiv.org/abs/2401.12241