Oyediran, H., Turner, W., Kim, K., & Barrows, M. (2024). Integration of 4D BIM and Robot Task Planning: Creation and Flow of Construction-Related Information for Action-Level Simulation of Indoor Wall Frame Installation.
Cita Chicago Style (17a ed.)Oyediran, Hafiz, William Turner, Kyungki Kim, y Matthew Barrows. Integration of 4D BIM and Robot Task Planning: Creation and Flow of Construction-Related Information for Action-Level Simulation of Indoor Wall Frame Installation. 2024.
Cita MLA (9a ed.)Oyediran, Hafiz, et al. Integration of 4D BIM and Robot Task Planning: Creation and Flow of Construction-Related Information for Action-Level Simulation of Indoor Wall Frame Installation. 2024.
Precaución: Estas citas no son 100% exactas.