Flexible Robust Optimal Bidding of Renewable Virtual Power Plants in Sequential Markets
Fuente:
arXiv
Saved in:
| Main Authors: | Nemati, Hadi, Sánchez-Martín, Pedro, Ortega, Álvaro, Sigrist, Lukas, Lobato, Enrique, Rouco, Luis |
|---|---|
| Format: | Preprint |
| Published: |
2024
|
| Subjects: | |
| Online Access: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
Integration of Concentrated Solar Power Plants in Renewable-Only VPP with Electrical and Thermal Demands: A Two-Stage Robust Bidding Approach
by: Nemati, Hadi, et al.
Published: (2025)
by: Nemati, Hadi, et al.
Published: (2025)
Enhancing Robust Multi-Market Participation of Renewable-Based VPPs through Flexible Resources
by: Nemati, Hadi, et al.
Published: (2025)
by: Nemati, Hadi, et al.
Published: (2025)
Single-level Robust Bidding of Renewable-only Virtual Power Plant in Energy and Ancillary Service Markets for Worst-case Profit
by: Nemati, Hadi, et al.
Published: (2024)
by: Nemati, Hadi, et al.
Published: (2024)
A Multi-Bound Robust Optimization Approach for Renewable-Based VPP Market Participation Considering Intra-Hourly Uncertainty Exposure
by: Nemati, Hadi, et al.
Published: (2026)
by: Nemati, Hadi, et al.
Published: (2026)
A Corrective Frequency-Constrained Unit Commitment with Data-driven Estimation of Optimal UFLS in Island Power Systems
by: Sarvarizadeh, Miad, et al.
Published: (2025)
by: Sarvarizadeh, Miad, et al.
Published: (2025)
Assessing Value of Renewable-based VPP Versus Electrical Storage: Multi-market Participation Under Different Scheduling Regimes and Uncertainties
by: Nemati, Hadi, et al.
Published: (2025)
by: Nemati, Hadi, et al.
Published: (2025)
Robust Frequency Constrained UC Using Data Driven Logistic Regression for Island Power Systems
by: Rajabdorri, Mohammad, et al.
Published: (2022)
by: Rajabdorri, Mohammad, et al.
Published: (2022)
A Comparative Study on Frequency-Constrained Unit Commitment Approaches in Island Power Systems
by: Sarvarizadeh, Miad, et al.
Published: (2025)
by: Sarvarizadeh, Miad, et al.
Published: (2025)
Inclusion of Frequency Nadir constraint in the Unit Commitment Problem of Small Power Systems Using Machine Learning
by: Rajabdorri, Mohammad, et al.
Published: (2022)
by: Rajabdorri, Mohammad, et al.
Published: (2022)
Implementing General-Order Frequency Dynamic Response Model and Frequency Excursion Duration Criterion in Unit Commitment Problem
by: Rajabdorri, Mohammad, et al.
Published: (2025)
by: Rajabdorri, Mohammad, et al.
Published: (2025)
Data-Driven Continuous-Time Framework for Frequency-Constrained Unit Commitment
by: Rajabdorri, Mohammad, et al.
Published: (2023)
by: Rajabdorri, Mohammad, et al.
Published: (2023)
Data-driven Estimation of Under Frequency Load Shedding after Outages in Small Power Systems
by: Rajabdorri, Mohammad, et al.
Published: (2023)
by: Rajabdorri, Mohammad, et al.
Published: (2023)
Optimizing Bidding Curves for Renewable Energy in Two-Settlement Electricity Markets
by: Zhao, Dongwei, et al.
Published: (2025)
by: Zhao, Dongwei, et al.
Published: (2025)
A Risk-aware Bi-level Bidding Strategy for Virtual Power Plant with Power-to-Hydrogen System
by: Yoo, Jaehyun, et al.
Published: (2025)
by: Yoo, Jaehyun, et al.
Published: (2025)
Revisiting angle stability in power systems with grid-forming power converters
by: Ávila-Martínez, Régulo E., et al.
Published: (2026)
by: Ávila-Martínez, Régulo E., et al.
Published: (2026)
Active-power control strategies in grid-forming power converters to improve transient stability in power systems with 100% converter-based generation
by: Ávila-Martínez, Régulo E., et al.
Published: (2026)
by: Ávila-Martínez, Régulo E., et al.
Published: (2026)
Analysis of Wind Power Integration in Electricity Markets LMP Pricing
by: Nemati, Narin, et al.
Published: (2024)
by: Nemati, Narin, et al.
Published: (2024)
Quasi Steady-State Frequency
by: Gutierrez-Florensa, Joan, et al.
Published: (2025)
by: Gutierrez-Florensa, Joan, et al.
Published: (2025)
Impact on transient stability of self-synchronisation control strategies in grid-forming VSC-based generators
by: Avila-Martinez, Regulo E., et al.
Published: (2025)
by: Avila-Martinez, Regulo E., et al.
Published: (2025)
Reinforcement Learning Based Bidding Framework with High-dimensional Bids in Power Markets
by: Liu, Jinyu, et al.
Published: (2024)
by: Liu, Jinyu, et al.
Published: (2024)
A Robust Optimization Framework for Flexible Industrial Energy Scheduling: Application to a Cement Plant with Market Participation
by: Rojas-Innocenti, Sebastián, et al.
Published: (2025)
by: Rojas-Innocenti, Sebastián, et al.
Published: (2025)
Robust Optimal Operation of Virtual Power Plants Under Decision-Dependent Uncertainty of Price Elasticity
by: Tan, Tao, et al.
Published: (2026)
by: Tan, Tao, et al.
Published: (2026)
Distributionally Robust Model Predictive Control for Virtual Power Plants
by: Recke, Nikolas, et al.
Published: (2026)
by: Recke, Nikolas, et al.
Published: (2026)
Optimal Bidding and Coordinated Dispatch of Hybrid Energy Systems in Regulation Markets
by: Mishra, Tanmay, et al.
Published: (2025)
by: Mishra, Tanmay, et al.
Published: (2025)
Impact of current limiters and fast voltage boosters in grid-forming VSC-based generators on transient stability
by: Ávila-Martínez, Régulo E., et al.
Published: (2024)
by: Ávila-Martínez, Régulo E., et al.
Published: (2024)
Leveraging P90 Requirement: Flexible Resources Bidding in Nordic Ancillary Service Markets
by: Gade, Peter A. V., et al.
Published: (2024)
by: Gade, Peter A. V., et al.
Published: (2024)
Dynamic Virtual Power Plants with Robust Frequency Regulation Capability
by: Zhu, Xiang, et al.
Published: (2024)
by: Zhu, Xiang, et al.
Published: (2024)
Sizing of Battery Considering Renewable Energy Bidding Strategy with Reinforcement Learning
by: Mantani, Taiyo, et al.
Published: (2026)
by: Mantani, Taiyo, et al.
Published: (2026)
Risk-Aware Multi-Market Scheduling of Virtual Power Plants with Dynamic Network Tariffs
by: Zapparoli, Lorenzo, et al.
Published: (2026)
by: Zapparoli, Lorenzo, et al.
Published: (2026)
Efficient Multi-Market Scheduling of Virtual Power Plants via Spectral Representation of Uncertainty
by: Zapparoli, Lorenzo, et al.
Published: (2026)
by: Zapparoli, Lorenzo, et al.
Published: (2026)
Optimal Frequency Support from Virtual Power Plants: Minimal Reserve and Allocation
by: Zhu, Xiang, et al.
Published: (2025)
by: Zhu, Xiang, et al.
Published: (2025)
Bidding Aggregated Flexibility in European Electricity Auctions
by: Ellemund, Gabriel, et al.
Published: (2025)
by: Ellemund, Gabriel, et al.
Published: (2025)
Bidding and Dispatch Strategies with Flexibility Quantification and Pricing for Electric Vehicle Aggregator in Joint Energy-Regulation Market
by: Xu, Manqi, et al.
Published: (2024)
by: Xu, Manqi, et al.
Published: (2024)
Long-term Hydrothermal Bid-based Market Simulator
by: Garcia, Joaquim Dias, et al.
Published: (2024)
by: Garcia, Joaquim Dias, et al.
Published: (2024)
Electricity Market Bidding for Renewable Electrolyzer Plants: An Opportunity Cost Approach
by: Johnsen, Andrea Gloppen, et al.
Published: (2025)
by: Johnsen, Andrea Gloppen, et al.
Published: (2025)
Quantum Hardware-in-the-Loop for Optimal Power Flow in Renewable-Integrated Power Systems
by: Kaseb, Zeynab, et al.
Published: (2025)
by: Kaseb, Zeynab, et al.
Published: (2025)
Large Language Model Assisted Optimal Bidding of BESS in FCAS Market: An AI-agent based Approach
by: Zhang, Borui, et al.
Published: (2024)
by: Zhang, Borui, et al.
Published: (2024)
Strategic Bidding in the Frequency-Containment Ancillary Services Market
by: Matamala, Carlos, et al.
Published: (2024)
by: Matamala, Carlos, et al.
Published: (2024)
Optimal Power Flow in Renewable-Integrated Power Systems: A Comprehensive Review
by: Chen, Zigang
Published: (2024)
by: Chen, Zigang
Published: (2024)
Two-Stage Robust Optimal Operation of Distribution Networks Considering Renewable Energy and Demand Asymmetric Uncertainties
by: Xiong, Zhisheng, et al.
Published: (2024)
by: Xiong, Zhisheng, et al.
Published: (2024)
Similar Items
-
Integration of Concentrated Solar Power Plants in Renewable-Only VPP with Electrical and Thermal Demands: A Two-Stage Robust Bidding Approach
by: Nemati, Hadi, et al.
Published: (2025) -
Enhancing Robust Multi-Market Participation of Renewable-Based VPPs through Flexible Resources
by: Nemati, Hadi, et al.
Published: (2025) -
Single-level Robust Bidding of Renewable-only Virtual Power Plant in Energy and Ancillary Service Markets for Worst-case Profit
by: Nemati, Hadi, et al.
Published: (2024) -
A Multi-Bound Robust Optimization Approach for Renewable-Based VPP Market Participation Considering Intra-Hourly Uncertainty Exposure
by: Nemati, Hadi, et al.
Published: (2026) -
A Corrective Frequency-Constrained Unit Commitment with Data-driven Estimation of Optimal UFLS in Island Power Systems
by: Sarvarizadeh, Miad, et al.
Published: (2025)