Minimizing Tardy Processing Time on a Single Machine in Near-Linear Time

Fuente: arXiv
Enregistré dans:
Détails bibliographiques
Auteurs principaux: Fischer, Nick, Wennmann, Leo
Format: Preprint
Publié: 2024
Sujets:
Accès en ligne:
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
_version_ 1866911070106419200
author Fischer, Nick
Wennmann, Leo
author_facet Fischer, Nick
Wennmann, Leo
contents In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence without violating their due dates. This problem is NP-hard, but a classical algorithm by Lawler and Moore from the 60s solves this problem in pseudo-polynomial time $O(nP)$, where $P$ is the total processing time of all jobs. With the aim to develop best-possible pseudo-polynomial-time algorithms, a recent wave of results has improved Lawler and Moore's algorithm for $1||\sum p_j U_j$: First to time $\tilde O(P^{7/4})$ [Bringmann, Fischer, Hermelin, Shabtay, Wellnitz; ICALP'20], then to time $\tilde O(P^{5/3})$ [Klein, Polak, Rohwedder; SODA'23], and finally to time $\tilde O(P^{7/5})$ [Schieber, Sitaraman; WADS'23]. It remained an exciting open question whether these works can be improved further. In this work we develop an algorithm in near-linear time $\tilde O(P)$ for the $1||\sum p_j U_j$ problem. This running time not only significantly improves upon the previous results, but also matches conditional lower bounds based on the Strong Exponential Time Hypothesis or the Set Cover Hypothesis and is therefore likely optimal (up to subpolynomial factors). Our new algorithm also extends to the case of $m$ machines in time $\tilde O(P^m)$. In contrast to the previous improvements, we take a different, more direct approach inspired by the recent reductions from Modular Subset Sum to dynamic string problems. We thereby arrive at a satisfyingly simple algorithm.
format Preprint
id arxiv_https___arxiv_org_abs_2402_13357
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle Minimizing Tardy Processing Time on a Single Machine in Near-Linear Time
Fischer, Nick
Wennmann, Leo
Data Structures and Algorithms
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence without violating their due dates. This problem is NP-hard, but a classical algorithm by Lawler and Moore from the 60s solves this problem in pseudo-polynomial time $O(nP)$, where $P$ is the total processing time of all jobs. With the aim to develop best-possible pseudo-polynomial-time algorithms, a recent wave of results has improved Lawler and Moore's algorithm for $1||\sum p_j U_j$: First to time $\tilde O(P^{7/4})$ [Bringmann, Fischer, Hermelin, Shabtay, Wellnitz; ICALP'20], then to time $\tilde O(P^{5/3})$ [Klein, Polak, Rohwedder; SODA'23], and finally to time $\tilde O(P^{7/5})$ [Schieber, Sitaraman; WADS'23]. It remained an exciting open question whether these works can be improved further. In this work we develop an algorithm in near-linear time $\tilde O(P)$ for the $1||\sum p_j U_j$ problem. This running time not only significantly improves upon the previous results, but also matches conditional lower bounds based on the Strong Exponential Time Hypothesis or the Set Cover Hypothesis and is therefore likely optimal (up to subpolynomial factors). Our new algorithm also extends to the case of $m$ machines in time $\tilde O(P^m)$. In contrast to the previous improvements, we take a different, more direct approach inspired by the recent reductions from Modular Subset Sum to dynamic string problems. We thereby arrive at a satisfyingly simple algorithm.
title Minimizing Tardy Processing Time on a Single Machine in Near-Linear Time
topic Data Structures and Algorithms
url https://arxiv.org/abs/2402.13357