Single-level Robust Bidding of Renewable-only Virtual Power Plant in Energy and Ancillary Service Markets for Worst-case Profit

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Nemati, Hadi, Sánchez-Martín, Pedro, Baringo, Ana, Ortega, Álvaro
Format: Preprint
Published: 2024
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866910354291818496
author Nemati, Hadi
Sánchez-Martín, Pedro
Baringo, Ana
Ortega, Álvaro
author_facet Nemati, Hadi
Sánchez-Martín, Pedro
Baringo, Ana
Ortega, Álvaro
contents This paper proposes a novel single-level robust mathematical approach to model the RES-only Virtual Power Plant (RVPP) bidding problem in the simultaneous Day Ahead Market (DAM) and Secondary Reserve Market (SRM). The worst-case profit of RVPP due to uncertainties related to electricity prices, Non-dispatchable Renewable Energy Sources (ND-RES) production, and flexible demand is captured. In order to find the worst-case profit in a single-level model, the relationship between price and energy uncertainties leads to some non-linear constraints, which are appropriately linearized. The simulation results show the superiority of the proposed robust model compared to those in the literature, as well as its computational efficiency.
format Preprint
id arxiv_https___arxiv_org_abs_2403_02953
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle Single-level Robust Bidding of Renewable-only Virtual Power Plant in Energy and Ancillary Service Markets for Worst-case Profit
Nemati, Hadi
Sánchez-Martín, Pedro
Baringo, Ana
Ortega, Álvaro
Systems and Control
This paper proposes a novel single-level robust mathematical approach to model the RES-only Virtual Power Plant (RVPP) bidding problem in the simultaneous Day Ahead Market (DAM) and Secondary Reserve Market (SRM). The worst-case profit of RVPP due to uncertainties related to electricity prices, Non-dispatchable Renewable Energy Sources (ND-RES) production, and flexible demand is captured. In order to find the worst-case profit in a single-level model, the relationship between price and energy uncertainties leads to some non-linear constraints, which are appropriately linearized. The simulation results show the superiority of the proposed robust model compared to those in the literature, as well as its computational efficiency.
title Single-level Robust Bidding of Renewable-only Virtual Power Plant in Energy and Ancillary Service Markets for Worst-case Profit
topic Systems and Control
url https://arxiv.org/abs/2403.02953