Cost and CO2 emissions co-optimisation of green hydrogen production in a grid-connected renewable energy system

Fuente: arXiv
Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Farah, Sleiman, Bokde, Neeraj, Andresen, Gorm Bruun
Format: Preprint
Veröffentlicht: 2024
Schlagworte:
Online-Zugang:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1866910572807716864
author Farah, Sleiman
Bokde, Neeraj
Andresen, Gorm Bruun
author_facet Farah, Sleiman
Bokde, Neeraj
Andresen, Gorm Bruun
contents Green hydrogen is essential for producing renewable fuels that are needed in sectors that are hard to electrify directly. Hydrogen production in a grid-connected hybrid renewable energy plant necessitates smart planning to meet long-term hydrogen trading agreements while minimising costs and emissions. Previous research analysed economic and environmental impact of hydrogen production based on full foresight of renewable energy availabilty, electricity price, and CO2 intensity in the electricity grid. However, the full foresight assumption is impractical in day-to-day operation, often leading to underestimations of both the cost and CO2 emissions associated with hydrogen production. Therefore, this research introduces a novel long-term planner that uses historical data and short-term forecasts to plan hydrogen production in the day-to-day operation of a grid-connected hybrid renewable energy plant. The long-term planner co-minimises cost and CO2 emissions to determine the hydrogen production for the next day taking into account the remaining hydrogen production and the time remaining until the end of the delivery period, which can be a week, a month, or a year. Extended delivery periods provide operation flexibility, enabling cost and CO2 emissions reductions. Significant reductions in CO2 emissions can be achieved with relatively small increases in the levelised cost. Under day-to-day operation, the levelised cost of hydrogen is marginally higher than that of the full foresight; the CO2 emissions can be up to 60% higher. Despite a significant portion of the produced hydrogen not meeting the criteria for green hydrogen designation under current rules, CO2 emissions are lower than those from existing alternative hydrogen production methods. These results underscore the importance of balancing cost considerations with environmental impacts in operational decision-making.
format Preprint
id arxiv_https___arxiv_org_abs_2404_11995
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle Cost and CO2 emissions co-optimisation of green hydrogen production in a grid-connected renewable energy system
Farah, Sleiman
Bokde, Neeraj
Andresen, Gorm Bruun
Systems and Control
Green hydrogen is essential for producing renewable fuels that are needed in sectors that are hard to electrify directly. Hydrogen production in a grid-connected hybrid renewable energy plant necessitates smart planning to meet long-term hydrogen trading agreements while minimising costs and emissions. Previous research analysed economic and environmental impact of hydrogen production based on full foresight of renewable energy availabilty, electricity price, and CO2 intensity in the electricity grid. However, the full foresight assumption is impractical in day-to-day operation, often leading to underestimations of both the cost and CO2 emissions associated with hydrogen production. Therefore, this research introduces a novel long-term planner that uses historical data and short-term forecasts to plan hydrogen production in the day-to-day operation of a grid-connected hybrid renewable energy plant. The long-term planner co-minimises cost and CO2 emissions to determine the hydrogen production for the next day taking into account the remaining hydrogen production and the time remaining until the end of the delivery period, which can be a week, a month, or a year. Extended delivery periods provide operation flexibility, enabling cost and CO2 emissions reductions. Significant reductions in CO2 emissions can be achieved with relatively small increases in the levelised cost. Under day-to-day operation, the levelised cost of hydrogen is marginally higher than that of the full foresight; the CO2 emissions can be up to 60% higher. Despite a significant portion of the produced hydrogen not meeting the criteria for green hydrogen designation under current rules, CO2 emissions are lower than those from existing alternative hydrogen production methods. These results underscore the importance of balancing cost considerations with environmental impacts in operational decision-making.
title Cost and CO2 emissions co-optimisation of green hydrogen production in a grid-connected renewable energy system
topic Systems and Control
url https://arxiv.org/abs/2404.11995