Full-Cycle Simulations of the Fermilab Booster

Fuente: arXiv
Salvato in:
Dettagli Bibliografici
Autori principali: Ostiguy, J. -F., Bhat, C. M.
Natura: Preprint
Pubblicazione: 2024
Soggetti:
Accesso online:
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866909214055596032
author Ostiguy, J. -F.
Bhat, C. M.
author_facet Ostiguy, J. -F.
Bhat, C. M.
contents The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.
format Preprint
id arxiv_https___arxiv_org_abs_2405_20998
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle Full-Cycle Simulations of the Fermilab Booster
Ostiguy, J. -F.
Bhat, C. M.
Accelerator Physics
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.
title Full-Cycle Simulations of the Fermilab Booster
topic Accelerator Physics
url https://arxiv.org/abs/2405.20998