A life cycle assessment of the ISIS-II Neutron and Muon Source

Fuente: arXiv
Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Wakeling, Hannah
Format: Preprint
Veröffentlicht: 2024
Schlagworte:
Online-Zugang:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1866913404785000448
author Wakeling, Hannah
author_facet Wakeling, Hannah
contents The ISIS-II Neutron and Muon source is the proposed next generation of, and successor to, the ISIS Neutron and Muon Source based at the Rutherford Appleton Laboratory in the United Kingdom. Anticipated to start construction in 2031, the ISIS-II project presents a unique opportunity to incorporate environmental sustainability practices from its inception. A Life Cycle Assessment (LCA) will examine the environmental impacts associated with each of the ISIS-II design options across the stages of the ISIS-II lifecycle, encompassing construction, operation, and eventual decommissioning. This proactive approach will assess all potential areas of environmental impact and seek to identify strategies for minimizing and mitigating negative impacts, wherever feasible. This paper will provide insights into the process and first results of the LCA of the entirety of the ISIS-II project.
format Preprint
id arxiv_https___arxiv_org_abs_2406_17700
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle A life cycle assessment of the ISIS-II Neutron and Muon Source
Wakeling, Hannah
Accelerator Physics
Instrumentation and Detectors
The ISIS-II Neutron and Muon source is the proposed next generation of, and successor to, the ISIS Neutron and Muon Source based at the Rutherford Appleton Laboratory in the United Kingdom. Anticipated to start construction in 2031, the ISIS-II project presents a unique opportunity to incorporate environmental sustainability practices from its inception. A Life Cycle Assessment (LCA) will examine the environmental impacts associated with each of the ISIS-II design options across the stages of the ISIS-II lifecycle, encompassing construction, operation, and eventual decommissioning. This proactive approach will assess all potential areas of environmental impact and seek to identify strategies for minimizing and mitigating negative impacts, wherever feasible. This paper will provide insights into the process and first results of the LCA of the entirety of the ISIS-II project.
title A life cycle assessment of the ISIS-II Neutron and Muon Source
topic Accelerator Physics
Instrumentation and Detectors
url https://arxiv.org/abs/2406.17700