A Deadline-Aware Scheduler for Smart Factory using WiFi 6

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Jain, Mohit, Mishra, Anis, Das, Syamantak, Wiese, Andreas, Bhattacharya, Arani, Maity, Mukulika
Format: Preprint
Published: 2024
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866913476721508352
author Jain, Mohit
Mishra, Anis
Das, Syamantak
Wiese, Andreas
Bhattacharya, Arani
Maity, Mukulika
author_facet Jain, Mohit
Mishra, Anis
Das, Syamantak
Wiese, Andreas
Bhattacharya, Arani
Maity, Mukulika
contents A key strategy for making production in factories more efficient is to collect data about the functioning of machines, and dynamically adapt their working. Such smart factories have data packets with a mix of stringent and non-stringent deadlines with varying levels of importance that need to be delivered via a wireless network. However, the scheduling of packets in the wireless network is crucial to satisfy the deadlines. In this work, we propose a technique of utilizing IEEE 802.11ax, popularly known as WiFi 6, for such applications. IEEE 802.11ax has a few unique characteristics, such as specific configurations of dividing the channels into resource units (RU) for packet transmission and synchronized parallel transmissions. We model the problem of scheduling packets by assigning profit to each packet and then maximizing the sum of profits. We first show that this problem is strongly NP-Hard, and then propose an approximation algorithm with a 12-approximate algorithm. Our approximation algorithm uses a variant of local search to associate the right RU configuration to each packet and identify the duration of each parallel transmission. Finally, we extensively simulate different scenarios to show that our algorithm works better than other benchmarks.
format Preprint
id arxiv_https___arxiv_org_abs_2408_12274
institution arXiv
publishDate 2024
record_format arxiv
spellingShingle A Deadline-Aware Scheduler for Smart Factory using WiFi 6
Jain, Mohit
Mishra, Anis
Das, Syamantak
Wiese, Andreas
Bhattacharya, Arani
Maity, Mukulika
Networking and Internet Architecture
A key strategy for making production in factories more efficient is to collect data about the functioning of machines, and dynamically adapt their working. Such smart factories have data packets with a mix of stringent and non-stringent deadlines with varying levels of importance that need to be delivered via a wireless network. However, the scheduling of packets in the wireless network is crucial to satisfy the deadlines. In this work, we propose a technique of utilizing IEEE 802.11ax, popularly known as WiFi 6, for such applications. IEEE 802.11ax has a few unique characteristics, such as specific configurations of dividing the channels into resource units (RU) for packet transmission and synchronized parallel transmissions. We model the problem of scheduling packets by assigning profit to each packet and then maximizing the sum of profits. We first show that this problem is strongly NP-Hard, and then propose an approximation algorithm with a 12-approximate algorithm. Our approximation algorithm uses a variant of local search to associate the right RU configuration to each packet and identify the duration of each parallel transmission. Finally, we extensively simulate different scenarios to show that our algorithm works better than other benchmarks.
title A Deadline-Aware Scheduler for Smart Factory using WiFi 6
topic Networking and Internet Architecture
url https://arxiv.org/abs/2408.12274