Enregistré dans:
Détails bibliographiques
Auteurs principaux: Mulesa, Oksana, Horvat, Petro, Radivilova, Tamara, Sabadosh, Volodymyr, Baranovskyi, Oleksii, Duran, Sergii
Format: Preprint
Publié: 2025
Sujets:
Accès en ligne:https://arxiv.org/abs/2501.01255
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
_version_ 1866909447121534976
author Mulesa, Oksana
Horvat, Petro
Radivilova, Tamara
Sabadosh, Volodymyr
Baranovskyi, Oleksii
Duran, Sergii
author_facet Mulesa, Oksana
Horvat, Petro
Radivilova, Tamara
Sabadosh, Volodymyr
Baranovskyi, Oleksii
Duran, Sergii
contents This paper reports an analysis of aspects of the project planning stage. The object of research is the decision-making processes that take place at this stage. This work considers the problem of building a hierarchy of tasks, their distribution among performers, taking into account restrictions on financial costs and duration of project implementation. Verbal and mathematical models of the task of constructing a hierarchy of tasks and other tasks that take place at the stage of project planning were constructed. Such indicators of the project implementation process efficiency were introduced as the time, cost, and cost-time efficiency. In order to be able to apply these criteria, the tasks of estimating the minimum value of the duration of the project and its minimum required cost were considered. Appropriate methods have been developed to solve them. The developed iterative method for assessing the minimum duration of project implementation is based on taking into account the possibility of simultaneous execution of various tasks. The method of estimating the minimum cost of the project is to build and solve the problem of Boolean programming. The values obtained as a result of solving these problems form an «ideal point», approaching which is enabled by the developed iterative method of constructing a hierarchy of tasks based on the method of sequential concessions. This method makes it possible to devise options for management decisions to obtain valid solutions to the problem. According to them, the decision maker can introduce a concession on the value of one or both components of the «ideal point» or change the input data to the task. The models and methods built can be used when planning projects in education, science, production, etc.
format Preprint
id arxiv_https___arxiv_org_abs_2501_01255
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Design of mechanisms for ensuring the execution of tasks in project planning
Mulesa, Oksana
Horvat, Petro
Radivilova, Tamara
Sabadosh, Volodymyr
Baranovskyi, Oleksii
Duran, Sergii
Cryptography and Security
90B50
H.4.3; K.6.4
This paper reports an analysis of aspects of the project planning stage. The object of research is the decision-making processes that take place at this stage. This work considers the problem of building a hierarchy of tasks, their distribution among performers, taking into account restrictions on financial costs and duration of project implementation. Verbal and mathematical models of the task of constructing a hierarchy of tasks and other tasks that take place at the stage of project planning were constructed. Such indicators of the project implementation process efficiency were introduced as the time, cost, and cost-time efficiency. In order to be able to apply these criteria, the tasks of estimating the minimum value of the duration of the project and its minimum required cost were considered. Appropriate methods have been developed to solve them. The developed iterative method for assessing the minimum duration of project implementation is based on taking into account the possibility of simultaneous execution of various tasks. The method of estimating the minimum cost of the project is to build and solve the problem of Boolean programming. The values obtained as a result of solving these problems form an «ideal point», approaching which is enabled by the developed iterative method of constructing a hierarchy of tasks based on the method of sequential concessions. This method makes it possible to devise options for management decisions to obtain valid solutions to the problem. According to them, the decision maker can introduce a concession on the value of one or both components of the «ideal point» or change the input data to the task. The models and methods built can be used when planning projects in education, science, production, etc.
title Design of mechanisms for ensuring the execution of tasks in project planning