Integrating IPbus ALFRED into the ALICE-FIT setup

Fuente: arXiv
Saved in:
Bibliographic Details
Main Author: Roslon, Krystian
Format: Preprint
Published: 2025
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866910777211879424
author Roslon, Krystian
author_facet Roslon, Krystian
contents The official data collection for the Run 3 of the Large Hadron Collider (LHC) at CERN in Geneva commenced on July 5, 2022, following approximately three and a half years of maintenance, upgrades, and commissioning. Among the many upgrades to ALICE (A Large Ion Collider Experiment) is the new Fast Interaction Trigger (FIT) detector. Constant improvements to FIT's hardware, firmware, and software will enable progressively better performance. Between November 2024 and March 2025, during the year-end technical stop, an update to the communication path between the Front-End Electronics (FEE) and the Detector Control System (DCS) is planned. This update will introduce a new approach based on the ALFRED (ALICE Low-Level Front-End Device) software, supported by the central DCS ALICE system. To address the challenge of integrating custom electronics with distributed control systems, this paper describes a novel extension of the Front-End Device (FRED) framework, which can interface bespoke electronics with standard SCADA (Supervisory Control and Data Acquisition) systems using IPbus. This framework can be applied to all detectors utilizing IPbus communication.
format Preprint
id arxiv_https___arxiv_org_abs_2501_04685
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Integrating IPbus ALFRED into the ALICE-FIT setup
Roslon, Krystian
Instrumentation and Detectors
High Energy Physics - Experiment
The official data collection for the Run 3 of the Large Hadron Collider (LHC) at CERN in Geneva commenced on July 5, 2022, following approximately three and a half years of maintenance, upgrades, and commissioning. Among the many upgrades to ALICE (A Large Ion Collider Experiment) is the new Fast Interaction Trigger (FIT) detector. Constant improvements to FIT's hardware, firmware, and software will enable progressively better performance. Between November 2024 and March 2025, during the year-end technical stop, an update to the communication path between the Front-End Electronics (FEE) and the Detector Control System (DCS) is planned. This update will introduce a new approach based on the ALFRED (ALICE Low-Level Front-End Device) software, supported by the central DCS ALICE system. To address the challenge of integrating custom electronics with distributed control systems, this paper describes a novel extension of the Front-End Device (FRED) framework, which can interface bespoke electronics with standard SCADA (Supervisory Control and Data Acquisition) systems using IPbus. This framework can be applied to all detectors utilizing IPbus communication.
title Integrating IPbus ALFRED into the ALICE-FIT setup
topic Instrumentation and Detectors
High Energy Physics - Experiment
url https://arxiv.org/abs/2501.04685