Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty

Fuente: arXiv
Enregistré dans:
Détails bibliographiques
Auteurs principaux: Zhang, Shuhao, Swevers, Jan
Format: Preprint
Publié: 2025
Sujets:
Accès en ligne:
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
_version_ 1866912202910334976
author Zhang, Shuhao
Swevers, Jan
author_facet Zhang, Shuhao
Swevers, Jan
contents This paper proposes a novel approach to formulate time-optimal point-to-point motion planning and control under uncertainty. The approach defines a robustified two-stage Optimal Control Problem (OCP), in which stage 1, with a fixed time grid, is seamlessly stitched with stage 2, which features a variable time grid. Stage 1 optimizes not only the nominal trajectory, but also feedback gains and corresponding state covariances, which robustify constraints in both stages. The outcome is a minimized uncertainty in stage 1 and a minimized total motion time for stage 2, both contributing to the time optimality and safety of the total motion. A timely replanning strategy is employed to handle changes in constraints and maintain feasibility, while a tailored iterative algorithm is proposed for efficient, real-time OCP execution.
format Preprint
id arxiv_https___arxiv_org_abs_2501_14526
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty
Zhang, Shuhao
Swevers, Jan
Robotics
Systems and Control
This paper proposes a novel approach to formulate time-optimal point-to-point motion planning and control under uncertainty. The approach defines a robustified two-stage Optimal Control Problem (OCP), in which stage 1, with a fixed time grid, is seamlessly stitched with stage 2, which features a variable time grid. Stage 1 optimizes not only the nominal trajectory, but also feedback gains and corresponding state covariances, which robustify constraints in both stages. The outcome is a minimized uncertainty in stage 1 and a minimized total motion time for stage 2, both contributing to the time optimality and safety of the total motion. A timely replanning strategy is employed to handle changes in constraints and maintain feasibility, while a tailored iterative algorithm is proposed for efficient, real-time OCP execution.
title Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty
topic Robotics
Systems and Control
url https://arxiv.org/abs/2501.14526