Saved in:
Bibliographic Details
Main Authors: Masaev, Sergey, Vingert, Valentina, Musiyachenko, Elena, Salal, Yass
Format: Preprint
Published: 2025
Subjects:
Online Access:https://arxiv.org/abs/2501.16108
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866909466893484032
author Masaev, Sergey
Vingert, Valentina
Musiyachenko, Elena
Salal, Yass
author_facet Masaev, Sergey
Vingert, Valentina
Musiyachenko, Elena
Salal, Yass
contents A general idea research is a lack of articles to estimate system indicator of the effectiveness of the strategy of human resources management (HR) at an economic object (enterprise). We are use the method of integral indicators for a comprehensive assessment of the activities of an economic object (enterprise). The economic object is formalized as a nonstationary dynamic system. The system has a dimension of 1.2 million parameters. The parameters of the object under research (business processes) are compared with staff responsibilities. The sanctions mode is set by blocking staff responsibilities in the interval in each time period t. The integral indicator is calculated according to the standard mode (Strategy 1) of the economic object (enterprise) and without blocking the staff responsibilities. Also, the integral indicator is calculated according to the non-standard operating mode of the enterprise (Strategy 2) with the blocking of staff responsibilities. The difference between the integral indicator of Strategy 2 and Strategy 1 is an estimation of the impact of the imposed sanctions. The resource consumption for the restoration of the normal operation of an economic object after the imposed sanctions is give (61.63 million rubles). Example 2 introduces equipment sanctions from America for a new project. An analysis of the indicators of a new project is carried out with the search and use of analog equipment.
format Preprint
id arxiv_https___arxiv_org_abs_2501_16108
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Control of a non-stationary dynamic system with estimating a strategy of human resources management by the integral indicators method
Masaev, Sergey
Vingert, Valentina
Musiyachenko, Elena
Salal, Yass
Optimization and Control
A general idea research is a lack of articles to estimate system indicator of the effectiveness of the strategy of human resources management (HR) at an economic object (enterprise). We are use the method of integral indicators for a comprehensive assessment of the activities of an economic object (enterprise). The economic object is formalized as a nonstationary dynamic system. The system has a dimension of 1.2 million parameters. The parameters of the object under research (business processes) are compared with staff responsibilities. The sanctions mode is set by blocking staff responsibilities in the interval in each time period t. The integral indicator is calculated according to the standard mode (Strategy 1) of the economic object (enterprise) and without blocking the staff responsibilities. Also, the integral indicator is calculated according to the non-standard operating mode of the enterprise (Strategy 2) with the blocking of staff responsibilities. The difference between the integral indicator of Strategy 2 and Strategy 1 is an estimation of the impact of the imposed sanctions. The resource consumption for the restoration of the normal operation of an economic object after the imposed sanctions is give (61.63 million rubles). Example 2 introduces equipment sanctions from America for a new project. An analysis of the indicators of a new project is carried out with the search and use of analog equipment.
title Control of a non-stationary dynamic system with estimating a strategy of human resources management by the integral indicators method
topic Optimization and Control
url https://arxiv.org/abs/2501.16108