Enregistré dans:
| Auteurs principaux: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
|---|---|
| Format: | Preprint |
| Publié: |
2025
|
| Sujets: | |
| Accès en ligne: | https://arxiv.org/abs/2505.00053 |
| Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
| _version_ | 1866908344249221120 |
|---|---|
| author | Xu, Xiao-Dong Zheng, Yong Sun, Zhi-Yu Song, Yu-Nan Sun, Bao-Hua Terashima, Satoru Wang, Chang-Jian Guo, Ge Li, Guang-Shuai Wei, Xiu-Lin Xu, Jun-Yao Zhang, Ji-Chao Cao, Yong Gao, Bing-Shui Han, Jia-Xing Liu, Jin-Rong Lu, Chen-Gui Jin, Shu-Ya Ong, Hooi Jin Qi, Hao-Tian Qin, Yun Sun, Ya-Zhou Tanihata, Isao Wan, Lu-Ping Wang, Kai-Long Wang, Shi-Tao Wang, Xin-Xu Wu, Tian-Yu Wu, Xiao-Tian Zhang, Mei-Xue Zhang, Wen-Wen Zhang, Xiao-Bin Zhang, Xue-Heng Zhao, Jian-Wei Zhou, Zi-Cheng Zhu, Li-Hua |
| author_facet | Xu, Xiao-Dong Zheng, Yong Sun, Zhi-Yu Song, Yu-Nan Sun, Bao-Hua Terashima, Satoru Wang, Chang-Jian Guo, Ge Li, Guang-Shuai Wei, Xiu-Lin Xu, Jun-Yao Zhang, Ji-Chao Cao, Yong Gao, Bing-Shui Han, Jia-Xing Liu, Jin-Rong Lu, Chen-Gui Jin, Shu-Ya Ong, Hooi Jin Qi, Hao-Tian Qin, Yun Sun, Ya-Zhou Tanihata, Isao Wan, Lu-Ping Wang, Kai-Long Wang, Shi-Tao Wang, Xin-Xu Wu, Tian-Yu Wu, Xiao-Tian Zhang, Mei-Xue Zhang, Wen-Wen Zhang, Xiao-Bin Zhang, Xue-Heng Zhao, Jian-Wei Zhou, Zi-Cheng Zhu, Li-Hua |
| contents | A new experimental platform was constructed at the Second Radioactive Ion Beam Line in Lanzhou (RIBLL2) of HIRFL-CSR accelerator facility at Lanzhou, China. Its performance, along with several newly developed detectors, was tested in two radioactive ion beam experiments utilizing a 400 MeV/u 40Ar beam and a 350 MeV/u 78Kr beam, respectively. The first results from these two experiments demonstrate a good particle identification capability of the setup, thereby affirming the full realization of the RIBLL2 separator. |
| format | Preprint |
| id |
arxiv_https___arxiv_org_abs_2505_00053 |
| institution | arXiv |
| publishDate | 2025 |
| record_format | arxiv |
| spellingShingle | Full realization of the RIBLL2 separator at the HIRFL-CSR facility Xu, Xiao-Dong Zheng, Yong Sun, Zhi-Yu Song, Yu-Nan Sun, Bao-Hua Terashima, Satoru Wang, Chang-Jian Guo, Ge Li, Guang-Shuai Wei, Xiu-Lin Xu, Jun-Yao Zhang, Ji-Chao Cao, Yong Gao, Bing-Shui Han, Jia-Xing Liu, Jin-Rong Lu, Chen-Gui Jin, Shu-Ya Ong, Hooi Jin Qi, Hao-Tian Qin, Yun Sun, Ya-Zhou Tanihata, Isao Wan, Lu-Ping Wang, Kai-Long Wang, Shi-Tao Wang, Xin-Xu Wu, Tian-Yu Wu, Xiao-Tian Zhang, Mei-Xue Zhang, Wen-Wen Zhang, Xiao-Bin Zhang, Xue-Heng Zhao, Jian-Wei Zhou, Zi-Cheng Zhu, Li-Hua Instrumentation and Detectors Nuclear Experiment Accelerator Physics A new experimental platform was constructed at the Second Radioactive Ion Beam Line in Lanzhou (RIBLL2) of HIRFL-CSR accelerator facility at Lanzhou, China. Its performance, along with several newly developed detectors, was tested in two radioactive ion beam experiments utilizing a 400 MeV/u 40Ar beam and a 350 MeV/u 78Kr beam, respectively. The first results from these two experiments demonstrate a good particle identification capability of the setup, thereby affirming the full realization of the RIBLL2 separator. |
| title | Full realization of the RIBLL2 separator at the HIRFL-CSR facility |
| topic | Instrumentation and Detectors Nuclear Experiment Accelerator Physics |
| url | https://arxiv.org/abs/2505.00053 |