Design, development and commissioning of a new towing tank at the University of Southampton: A decade of endeavour

Fuente: arXiv
Salvato in:
Dettagli Bibliografici
Autore principale: Malas, B
Natura: Preprint
Pubblicazione: 2025
Soggetti:
Accesso online:
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866913889069826048
author Malas, B
author_facet Malas, B
contents The University of Southampton in the United Kingdom is worldly renowned in the naval architecture domain. For several decades, the researchers in hydrodynamics have been discussing the need of a middle-sized towing tank to accommodate the teaching, research and commercial experiments that previously had to be outsourced. In the early 2010s, the renovation of the Boldrewood campus was decided and opened the way for the construction of this 138 m long, 6 m wide and 3.5 m deep facility. Commissioned in 2022, the tank is equipped with a 12 independent paddles wavemaker and an innovative carriage capable of speeds of up to 10 m/s. The design, construction and commissioning of the experimental facility were subject to many hurdles and delays that are described here. Details about the technical solutions and chosen equipment are provided. Validation experiments are also described.
format Preprint
id arxiv_https___arxiv_org_abs_2506_09057
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Design, development and commissioning of a new towing tank at the University of Southampton: A decade of endeavour
Malas, B
Instrumentation and Detectors
The University of Southampton in the United Kingdom is worldly renowned in the naval architecture domain. For several decades, the researchers in hydrodynamics have been discussing the need of a middle-sized towing tank to accommodate the teaching, research and commercial experiments that previously had to be outsourced. In the early 2010s, the renovation of the Boldrewood campus was decided and opened the way for the construction of this 138 m long, 6 m wide and 3.5 m deep facility. Commissioned in 2022, the tank is equipped with a 12 independent paddles wavemaker and an innovative carriage capable of speeds of up to 10 m/s. The design, construction and commissioning of the experimental facility were subject to many hurdles and delays that are described here. Details about the technical solutions and chosen equipment are provided. Validation experiments are also described.
title Design, development and commissioning of a new towing tank at the University of Southampton: A decade of endeavour
topic Instrumentation and Detectors
url https://arxiv.org/abs/2506.09057