Guardado en:
Detalles Bibliográficos
Autores principales: Hameed, Zeenat, Træholt, Chresten
Formato: Preprint
Publicado: 2025
Materias:
Acceso en línea:https://arxiv.org/abs/2506.13281
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866909650080759808
author Hameed, Zeenat
Træholt, Chresten
author_facet Hameed, Zeenat
Træholt, Chresten
contents Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study.
format Preprint
id arxiv_https___arxiv_org_abs_2506_13281
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle EPC Framework for BESS Projects
Hameed, Zeenat
Træholt, Chresten
Systems and Control
Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study.
title EPC Framework for BESS Projects
topic Systems and Control
url https://arxiv.org/abs/2506.13281