Guardado en:
| Autores principales: | , |
|---|---|
| Formato: | Preprint |
| Publicado: |
2025
|
| Materias: | |
| Acceso en línea: | https://arxiv.org/abs/2506.13281 |
| Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
| _version_ | 1866909650080759808 |
|---|---|
| author | Hameed, Zeenat Træholt, Chresten |
| author_facet | Hameed, Zeenat Træholt, Chresten |
| contents | Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study. |
| format | Preprint |
| id |
arxiv_https___arxiv_org_abs_2506_13281 |
| institution | arXiv |
| publishDate | 2025 |
| record_format | arxiv |
| spellingShingle | EPC Framework for BESS Projects Hameed, Zeenat Træholt, Chresten Systems and Control Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study. |
| title | EPC Framework for BESS Projects |
| topic | Systems and Control |
| url | https://arxiv.org/abs/2506.13281 |