Saved in:
| Main Authors: | , |
|---|---|
| Format: | Preprint |
| Published: |
2025
|
| Subjects: | |
| Online Access: | https://arxiv.org/abs/2506.13281 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Table of Contents:
- Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study.