Day-Ahead Transmission Grid Topology Optimization Considering Renewable Energy Sources' Uncertainty

Fuente: arXiv
Salvato in:
Dettagli Bibliografici
Autori principali: Bastianel, Giacomo, Van Hertem, Dirk, Ergun, Hakan, Roald, Line
Natura: Preprint
Pubblicazione: 2025
Soggetti:
Accesso online:
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866911159384276992
author Bastianel, Giacomo
Van Hertem, Dirk
Ergun, Hakan
Roald, Line
author_facet Bastianel, Giacomo
Van Hertem, Dirk
Ergun, Hakan
Roald, Line
contents The increasing renewable penetration introduces significant uncertainty in power system operations. At the same time, the existing transmission grid is often already congested, and urgently needed reinforcements are frequently delayed due to several constraints. To address these challenges, adjusting the grid topology based on congestion patterns is considered a non-costly remedy to guarantee efficient power transmission. Based on this idea, this paper proposes a grid topology optimization model combining optimal transmission switching and busbar splitting for AC and hybrid AC/DC grids. The methodology incorporates RES forecast uncertainty through a scenario-based stochastic optimization approach, using real offshore wind data and K-means clustering to generate representative forecast error scenarios. The proposed model includes several formulations to be compared with a plain optimal power flow (OPF) model: hourly optimizing the topology, one topology for 24 hours, or a limited number of switching actions over a day. The grid topology optimization model is formulated as a Mixed-Integer Quadratic Convex Problem, optimized based on the day-ahead (D-1) RES forecast and validated for AC-feasibility via an AC-OPF formulation. Based on the generation setpoints of the feasibility check, a redispatch simulation based on the measured (D) RES realization is then computed. The methodology is tested on an AC 30-bus test case and a hybrid AC/DC 50-bus test case, for a 24-hours (30-bus) and a 14-days (both test cases) time series. The results highlight the economic benefits brought by grid topology optimization for congested test cases with high penetration of RES. In addition, the results demonstrate that accounting for RES uncertainty with at least 6 to 8 scenarios leads to lower or comparable total costs to deterministic day-ahead forecasts, even when limiting the frequency of topological actions.
format Preprint
id arxiv_https___arxiv_org_abs_2509_13994
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Day-Ahead Transmission Grid Topology Optimization Considering Renewable Energy Sources' Uncertainty
Bastianel, Giacomo
Van Hertem, Dirk
Ergun, Hakan
Roald, Line
Systems and Control
The increasing renewable penetration introduces significant uncertainty in power system operations. At the same time, the existing transmission grid is often already congested, and urgently needed reinforcements are frequently delayed due to several constraints. To address these challenges, adjusting the grid topology based on congestion patterns is considered a non-costly remedy to guarantee efficient power transmission. Based on this idea, this paper proposes a grid topology optimization model combining optimal transmission switching and busbar splitting for AC and hybrid AC/DC grids. The methodology incorporates RES forecast uncertainty through a scenario-based stochastic optimization approach, using real offshore wind data and K-means clustering to generate representative forecast error scenarios. The proposed model includes several formulations to be compared with a plain optimal power flow (OPF) model: hourly optimizing the topology, one topology for 24 hours, or a limited number of switching actions over a day. The grid topology optimization model is formulated as a Mixed-Integer Quadratic Convex Problem, optimized based on the day-ahead (D-1) RES forecast and validated for AC-feasibility via an AC-OPF formulation. Based on the generation setpoints of the feasibility check, a redispatch simulation based on the measured (D) RES realization is then computed. The methodology is tested on an AC 30-bus test case and a hybrid AC/DC 50-bus test case, for a 24-hours (30-bus) and a 14-days (both test cases) time series. The results highlight the economic benefits brought by grid topology optimization for congested test cases with high penetration of RES. In addition, the results demonstrate that accounting for RES uncertainty with at least 6 to 8 scenarios leads to lower or comparable total costs to deterministic day-ahead forecasts, even when limiting the frequency of topological actions.
title Day-Ahead Transmission Grid Topology Optimization Considering Renewable Energy Sources' Uncertainty
topic Systems and Control
url https://arxiv.org/abs/2509.13994