Coordinated vs. Sequential Transmission Planning

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Domeshek, Maya, Graf, Christoph, Ünel, Burçin
Format: Preprint
Published: 2025
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866917444367417344
author Domeshek, Maya
Graf, Christoph
Ünel, Burçin
author_facet Domeshek, Maya
Graf, Christoph
Ünel, Burçin
contents Coordinated planning of generation, storage, and transmission more accurately captures the interactions among these three capacity types necessary to meet electricity demand, at least in theory. However, in practice, U.S. system operators typically follow a sequential planning approach: They first determine future generation and storage additions based on an assumed unconstrained (`copper plate') system. Next, they perform dispatch simulations of this projected generation and storage capacity mix on the existing transmission grid to identify transmission constraint violations. These violations indicate the need for transmission upgrades. We describe a multistage, multi-locational planning model that co-optimizes generation, storage, and transmission investments. The model respects reliability constraints as well as state energy and climate policies. We test the two planning approaches using a current stakeholder-informed 20-zone model of the PJM region, developed for the current FERC Order No. 1920 compliance filing process. In our most conservative model specification, we find that the co-optimized approach estimates 67% lower transmission upgrade needs than the sequential model, leading to total system costs that are .6% lower and similar reliability and climate outcomes. Our sensitivities show larger transmission and cost savings and reliability and climate benefits from co-optimized planning.
format Preprint
id arxiv_https___arxiv_org_abs_2509_24959
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Coordinated vs. Sequential Transmission Planning
Domeshek, Maya
Graf, Christoph
Ünel, Burçin
Systems and Control
Coordinated planning of generation, storage, and transmission more accurately captures the interactions among these three capacity types necessary to meet electricity demand, at least in theory. However, in practice, U.S. system operators typically follow a sequential planning approach: They first determine future generation and storage additions based on an assumed unconstrained (`copper plate') system. Next, they perform dispatch simulations of this projected generation and storage capacity mix on the existing transmission grid to identify transmission constraint violations. These violations indicate the need for transmission upgrades. We describe a multistage, multi-locational planning model that co-optimizes generation, storage, and transmission investments. The model respects reliability constraints as well as state energy and climate policies. We test the two planning approaches using a current stakeholder-informed 20-zone model of the PJM region, developed for the current FERC Order No. 1920 compliance filing process. In our most conservative model specification, we find that the co-optimized approach estimates 67% lower transmission upgrade needs than the sequential model, leading to total system costs that are .6% lower and similar reliability and climate outcomes. Our sensitivities show larger transmission and cost savings and reliability and climate benefits from co-optimized planning.
title Coordinated vs. Sequential Transmission Planning
topic Systems and Control
url https://arxiv.org/abs/2509.24959