Guardado en:
Detalles Bibliográficos
Autores principales: Missaoui, Ahmed, Ozturk, Cemalettin, O'Sullivan, Barry
Formato: Preprint
Publicado: 2025
Materias:
Acceso en línea:https://arxiv.org/abs/2510.03377
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866908575154044928
author Missaoui, Ahmed
Ozturk, Cemalettin
O'Sullivan, Barry
author_facet Missaoui, Ahmed
Ozturk, Cemalettin
O'Sullivan, Barry
contents The scarcity of non-renewable energy sources, geopolitical problems in its supply, increasing prices, and the impact of climate change, force the global economy to develop more energy-efficient solutions for their operations. The Manufacturing sector is not excluded from this challenge as one of the largest consumers of energy. Energy-efficient scheduling is a method that attracts manufacturing companies to reduce their consumption as it can be quickly deployed and can show impact immediately. In this study, the hybrid flow shop scheduling problem with blocking constraint (BHFS) is investigated in which we seek to minimize the latest completion time (i.e. makespan) and overall energy consumption, a typical manufacturing setting across many industries from automotive to pharmaceutical. Energy consumption and the latest completion time of customer orders are usually conflicting objectives. Therefore, we first formulate the problem as a novel multi-objective mixed integer programming (MIP) model and propose an augmented epsilon-constraint method for finding the Pareto-optimal solutions. Also, an effective multi-objective metaheuristic algorithm. Refined Iterated Pareto Greedy (RIPG), is developed to solve large instances in reasonable time. Our proposed methods are benchmarked using small, medium, and large-size instances to evaluate their efficiency. Two well-known algorithms are adopted for comparing our novel approaches. The computational results show the effectiveness of our method.
format Preprint
id arxiv_https___arxiv_org_abs_2510_03377
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Refined Iterated Pareto Greedy for Energy-aware Hybrid Flowshop Scheduling with Blocking Constraints
Missaoui, Ahmed
Ozturk, Cemalettin
O'Sullivan, Barry
Artificial Intelligence
The scarcity of non-renewable energy sources, geopolitical problems in its supply, increasing prices, and the impact of climate change, force the global economy to develop more energy-efficient solutions for their operations. The Manufacturing sector is not excluded from this challenge as one of the largest consumers of energy. Energy-efficient scheduling is a method that attracts manufacturing companies to reduce their consumption as it can be quickly deployed and can show impact immediately. In this study, the hybrid flow shop scheduling problem with blocking constraint (BHFS) is investigated in which we seek to minimize the latest completion time (i.e. makespan) and overall energy consumption, a typical manufacturing setting across many industries from automotive to pharmaceutical. Energy consumption and the latest completion time of customer orders are usually conflicting objectives. Therefore, we first formulate the problem as a novel multi-objective mixed integer programming (MIP) model and propose an augmented epsilon-constraint method for finding the Pareto-optimal solutions. Also, an effective multi-objective metaheuristic algorithm. Refined Iterated Pareto Greedy (RIPG), is developed to solve large instances in reasonable time. Our proposed methods are benchmarked using small, medium, and large-size instances to evaluate their efficiency. Two well-known algorithms are adopted for comparing our novel approaches. The computational results show the effectiveness of our method.
title Refined Iterated Pareto Greedy for Energy-aware Hybrid Flowshop Scheduling with Blocking Constraints
topic Artificial Intelligence
url https://arxiv.org/abs/2510.03377