Contingency-Aware Nodal Optimal Power Investments with High Temporal Resolution

Fuente: arXiv
Guardado en:
Detalles Bibliográficos
Autores principales: Lee, Thomas, Sun, Andy
Formato: Preprint
Publicado: 2025
Materias:
Acceso en línea:
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866911577752469504
author Lee, Thomas
Sun, Andy
author_facet Lee, Thomas
Sun, Andy
contents We present CANOPI, a novel algorithmic framework, for solving the Contingency-Aware Nodal Power Investments problem, a large-scale nonlinear optimization problem that jointly optimizes investments in generation, storage, and transmission upgrades, including representations of unit commitment and long-duration storage. The underlying problem is nonlinear due to the impact of transmission upgrades on impedances, and the problem's large scale arises from the confluence of spatial and temporal resolutions. We propose algorithmic approaches to address these computational challenges. We pose a linear approximation of the overall nonlinear model, and develop a fixed-point algorithm to adjust for the nonlinear impedance feedback effect. We solve the large-scale linear expansion model with a specialized level-bundle method leveraging a novel interleaved approach to contingency constraint generation. We introduce a minimal cycle basis algorithm that improves the numerical sparsity of cycle-based DC power flow formulations, accelerating solve times for the operational subproblems. CANOPI is demonstrated on a 1493-bus Western Interconnection test system built from realistic-geography network data, with hourly operations spanning 52 week-long scenarios and a total possible set of 20 billion individual transmission contingency constraints. Numerical results quantify reliability and economic benefits of incorporating transmission contingencies in integrated planning models and highlight the computational advantages of the proposed methods.
format Preprint
id arxiv_https___arxiv_org_abs_2510_03484
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Contingency-Aware Nodal Optimal Power Investments with High Temporal Resolution
Lee, Thomas
Sun, Andy
Optimization and Control
Systems and Control
We present CANOPI, a novel algorithmic framework, for solving the Contingency-Aware Nodal Power Investments problem, a large-scale nonlinear optimization problem that jointly optimizes investments in generation, storage, and transmission upgrades, including representations of unit commitment and long-duration storage. The underlying problem is nonlinear due to the impact of transmission upgrades on impedances, and the problem's large scale arises from the confluence of spatial and temporal resolutions. We propose algorithmic approaches to address these computational challenges. We pose a linear approximation of the overall nonlinear model, and develop a fixed-point algorithm to adjust for the nonlinear impedance feedback effect. We solve the large-scale linear expansion model with a specialized level-bundle method leveraging a novel interleaved approach to contingency constraint generation. We introduce a minimal cycle basis algorithm that improves the numerical sparsity of cycle-based DC power flow formulations, accelerating solve times for the operational subproblems. CANOPI is demonstrated on a 1493-bus Western Interconnection test system built from realistic-geography network data, with hourly operations spanning 52 week-long scenarios and a total possible set of 20 billion individual transmission contingency constraints. Numerical results quantify reliability and economic benefits of incorporating transmission contingencies in integrated planning models and highlight the computational advantages of the proposed methods.
title Contingency-Aware Nodal Optimal Power Investments with High Temporal Resolution
topic Optimization and Control
Systems and Control
url https://arxiv.org/abs/2510.03484