Resource-dependent process times in hybrid flexible flowshops

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Avgerinos, Ioannis, Mourtos, Ioannis, Papathanasiou, Dimitrios, Zois, Georgios
Format: Preprint
Published: 2025
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866914105032441856
author Avgerinos, Ioannis
Mourtos, Ioannis
Papathanasiou, Dimitrios
Zois, Georgios
author_facet Avgerinos, Ioannis
Mourtos, Ioannis
Papathanasiou, Dimitrios
Zois, Georgios
contents The effect of resource allocation on manufacturing motivates us to examine a scheduling variant that is of practical significance yet remains overlooked. We examine a Hybrid Flexible Flowshop (HFFS), i.e., an environment where a set of jobs is scheduled across multiple stages (each stage having multiple identical machines) yet some jobs may skip some stages. In addition, we consider processing times that depend on the resources assigned to a job at each stage, transportation times between machines and limited-capacity buffers before and after each stage. We introduce a Constraint Programming (CP) formulation, which we then decompose through Logic-Based Benders Decomposition (LBBD). We tighten formulations by a set of makespan lower bounds, the strongest of which arises from a reduction to malleable scheduling. By modifying recent instance generators, we experiment with up to 400 jobs, 8 stages, and 10 parallel machines per stage. The results demonstrate competitive integrality gaps, highlighting the efficiency of our approach at scale and on an HFFS variant quite beyond the current literature.
format Preprint
id arxiv_https___arxiv_org_abs_2510_18093
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Resource-dependent process times in hybrid flexible flowshops
Avgerinos, Ioannis
Mourtos, Ioannis
Papathanasiou, Dimitrios
Zois, Georgios
Optimization and Control
The effect of resource allocation on manufacturing motivates us to examine a scheduling variant that is of practical significance yet remains overlooked. We examine a Hybrid Flexible Flowshop (HFFS), i.e., an environment where a set of jobs is scheduled across multiple stages (each stage having multiple identical machines) yet some jobs may skip some stages. In addition, we consider processing times that depend on the resources assigned to a job at each stage, transportation times between machines and limited-capacity buffers before and after each stage. We introduce a Constraint Programming (CP) formulation, which we then decompose through Logic-Based Benders Decomposition (LBBD). We tighten formulations by a set of makespan lower bounds, the strongest of which arises from a reduction to malleable scheduling. By modifying recent instance generators, we experiment with up to 400 jobs, 8 stages, and 10 parallel machines per stage. The results demonstrate competitive integrality gaps, highlighting the efficiency of our approach at scale and on an HFFS variant quite beyond the current literature.
title Resource-dependent process times in hybrid flexible flowshops
topic Optimization and Control
url https://arxiv.org/abs/2510.18093