Risk-aware stochastic scheduling of multi-market energy storage systems

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Patrón, Gabriel D., Zhang, Di, Ghilardi, Lavinia M. P., Blom, Evelin, Goodridge, Maldon, Solis, Erik, Jahangir, Hamidreza, Angarita, Jorge, Ganesan, Nandhini, West, Kevin, Shah, Nilay, Tsay, Calvin
Format: Preprint
Published: 2025
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866910194989006848
author Patrón, Gabriel D.
Zhang, Di
Ghilardi, Lavinia M. P.
Blom, Evelin
Goodridge, Maldon
Solis, Erik
Jahangir, Hamidreza
Angarita, Jorge
Ganesan, Nandhini
West, Kevin
Shah, Nilay
Tsay, Calvin
author_facet Patrón, Gabriel D.
Zhang, Di
Ghilardi, Lavinia M. P.
Blom, Evelin
Goodridge, Maldon
Solis, Erik
Jahangir, Hamidreza
Angarita, Jorge
Ganesan, Nandhini
West, Kevin
Shah, Nilay
Tsay, Calvin
contents Energy storage promotes the integration of renewables by operating with charge and discharge policies that balance an intermittent power supply. A key challenge in this emerging sector is how to optimize the operation of storage assets given future price uncertainties and the need to recover the costs of project finance while ensuring an attractive return on equity and hedging against downside risk. This study investigates the scheduling of energy storage assets under price uncertainty, with a focus on electricity markets. A two-stage stochastic risk-constrained approach is employed, whereby electricity price trajectories or specific power markets are observed, allowing for recourse in the schedule. Conditional value-at-risk is used to quantify risk in the optimization problems; this allows for explicit specification of a probabilistic risk limit. The proposed approach is tested in an integrated hydrogen system (IHS) and a battery energy storage system (BESS). In the joint design and operation context for the IHS, the risk constraint results in large installed unit capacities, increasing capital cost but enabling more inventory to buffer price uncertainty. In both case studies, there is an operational trade-off between risk and expected reward; this is reflected in higher expected costs (or lower expected profits) with increasing risk aversion. Despite the decrease in expected reward (up to 500\$k), both systems exhibit substantial benefits of increasing risk aversion (up to 1.5\$mn) with respect to risk-neutral settings. This work provides a general method to address uncertainties in energy storage scheduling, allowing operators to input their level of risk tolerance on asset decisions.
format Preprint
id arxiv_https___arxiv_org_abs_2510_27528
institution arXiv
publishDate 2025
record_format arxiv
spellingShingle Risk-aware stochastic scheduling of multi-market energy storage systems
Patrón, Gabriel D.
Zhang, Di
Ghilardi, Lavinia M. P.
Blom, Evelin
Goodridge, Maldon
Solis, Erik
Jahangir, Hamidreza
Angarita, Jorge
Ganesan, Nandhini
West, Kevin
Shah, Nilay
Tsay, Calvin
Optimization and Control
Systems and Control
Risk Management
Energy storage promotes the integration of renewables by operating with charge and discharge policies that balance an intermittent power supply. A key challenge in this emerging sector is how to optimize the operation of storage assets given future price uncertainties and the need to recover the costs of project finance while ensuring an attractive return on equity and hedging against downside risk. This study investigates the scheduling of energy storage assets under price uncertainty, with a focus on electricity markets. A two-stage stochastic risk-constrained approach is employed, whereby electricity price trajectories or specific power markets are observed, allowing for recourse in the schedule. Conditional value-at-risk is used to quantify risk in the optimization problems; this allows for explicit specification of a probabilistic risk limit. The proposed approach is tested in an integrated hydrogen system (IHS) and a battery energy storage system (BESS). In the joint design and operation context for the IHS, the risk constraint results in large installed unit capacities, increasing capital cost but enabling more inventory to buffer price uncertainty. In both case studies, there is an operational trade-off between risk and expected reward; this is reflected in higher expected costs (or lower expected profits) with increasing risk aversion. Despite the decrease in expected reward (up to 500\$k), both systems exhibit substantial benefits of increasing risk aversion (up to 1.5\$mn) with respect to risk-neutral settings. This work provides a general method to address uncertainties in energy storage scheduling, allowing operators to input their level of risk tolerance on asset decisions.
title Risk-aware stochastic scheduling of multi-market energy storage systems
topic Optimization and Control
Systems and Control
Risk Management
url https://arxiv.org/abs/2510.27528