Development of Design for the STS Extraction Magnet System

Fuente: arXiv
Guardado en:
Detalles Bibliográficos
Autores principales: Chernenok, V., Cheban, S., Harding, D. J, Kashikhin, V., Strauss, T., Szabo, B., Allitt, M., Boyd, L.
Formato: Preprint
Publicado: 2026
Materias:
Acceso en línea:
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866909985460453376
author Chernenok, V.
Cheban, S.
Harding, D. J
Kashikhin, V.
Strauss, T.
Szabo, B.
Allitt, M.
Boyd, L.
author_facet Chernenok, V.
Cheban, S.
Harding, D. J
Kashikhin, V.
Strauss, T.
Szabo, B.
Allitt, M.
Boyd, L.
contents The Oak Ridge National Laboratory STS Project will enhance the Spallation Neutron Source by adding a new neutron source. The upgrade includes a 30% increase in beam energy and a 50% boost in beam current, doubling the accelerator's power capability to 2.8 MW. The Ring-to-Second-Target Beam Transport (RTST) system is vital in directing high-energy proton beams to the new second target station. New magnets have to fit into a restricted space within the existing beamline to add the new extraction line. New, fast kicker magnets (Pulsed Dipole), a focusing quad with an aperture for both beamlines (Large Quad) and the replacement of existing 21Q40 Quads with 'Narrow Quads' having identical fields as the existing design are Fermilab's responsibility. The design of these magnets poses unique challenges, as in addition to the high requirements on the quality of magnetic fields, they are subject to major restrictions related to their dimensions.
format Preprint
id arxiv_https___arxiv_org_abs_2601_05342
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Development of Design for the STS Extraction Magnet System
Chernenok, V.
Cheban, S.
Harding, D. J
Kashikhin, V.
Strauss, T.
Szabo, B.
Allitt, M.
Boyd, L.
Accelerator Physics
The Oak Ridge National Laboratory STS Project will enhance the Spallation Neutron Source by adding a new neutron source. The upgrade includes a 30% increase in beam energy and a 50% boost in beam current, doubling the accelerator's power capability to 2.8 MW. The Ring-to-Second-Target Beam Transport (RTST) system is vital in directing high-energy proton beams to the new second target station. New magnets have to fit into a restricted space within the existing beamline to add the new extraction line. New, fast kicker magnets (Pulsed Dipole), a focusing quad with an aperture for both beamlines (Large Quad) and the replacement of existing 21Q40 Quads with 'Narrow Quads' having identical fields as the existing design are Fermilab's responsibility. The design of these magnets poses unique challenges, as in addition to the high requirements on the quality of magnetic fields, they are subject to major restrictions related to their dimensions.
title Development of Design for the STS Extraction Magnet System
topic Accelerator Physics
url https://arxiv.org/abs/2601.05342