Saved in:
Bibliographic Details
Main Authors: Sobhani, Zahra, Shahrokhi, Mahmoud
Format: Preprint
Published: 2026
Subjects:
Online Access:https://arxiv.org/abs/2601.09194
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866914260043431936
author Sobhani, Zahra
Shahrokhi, Mahmoud
author_facet Sobhani, Zahra
Shahrokhi, Mahmoud
contents Purpose: The model allocates the system components orders to the suppliers to minimize the parts price and the system construction delay penalties and maximize the system availability during its use. It considers the quantity-based discount and variation of delivery lead time by ordering similar components. The model also reflects the prerequisite relationships between construction activities and calculates the delay penalty resulting from parts delivery lead time. Design/methodology/approach: This research presents a model for selecting suppliers of components of an industrial series-parallel multi-state system. A nonlinear binary mathematical program uses the Markov process results to select system components. It minimizes the total system construction phase costs, including the components' price, and the system construction delay penalty, and the system exploitation phase costs, including the system shutdown and working at half capacity. Findings: The model allocates the optimal orders for a typical industrial system's components, composing four elements. The proposed approach combines the nonlinear binary program and the Markov process results to optimize the system life cycle parameters, including the system construction cost and operational availability. Originality/value: Using the Markov chain results in binary nonlinear mathematical programming, this study attempts to strike the right balance between the construction phase's objectives and an industrial unit's operation phase.
format Preprint
id arxiv_https___arxiv_org_abs_2601_09194
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations
Sobhani, Zahra
Shahrokhi, Mahmoud
Optimization and Control
Systems and Control
Purpose: The model allocates the system components orders to the suppliers to minimize the parts price and the system construction delay penalties and maximize the system availability during its use. It considers the quantity-based discount and variation of delivery lead time by ordering similar components. The model also reflects the prerequisite relationships between construction activities and calculates the delay penalty resulting from parts delivery lead time. Design/methodology/approach: This research presents a model for selecting suppliers of components of an industrial series-parallel multi-state system. A nonlinear binary mathematical program uses the Markov process results to select system components. It minimizes the total system construction phase costs, including the components' price, and the system construction delay penalty, and the system exploitation phase costs, including the system shutdown and working at half capacity. Findings: The model allocates the optimal orders for a typical industrial system's components, composing four elements. The proposed approach combines the nonlinear binary program and the Markov process results to optimize the system life cycle parameters, including the system construction cost and operational availability. Originality/value: Using the Markov chain results in binary nonlinear mathematical programming, this study attempts to strike the right balance between the construction phase's objectives and an industrial unit's operation phase.
title System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations
topic Optimization and Control
Systems and Control
url https://arxiv.org/abs/2601.09194