Optimal County-Level Siting of Data Centers in the United States

Fuente: arXiv
Salvato in:
Dettagli Bibliografici
Autori principali: Vabson, Maria, Zater, Muhy Eddin, Sajadi, Amir, Baker, Kyri, Hodge, Bri-Mathias
Natura: Preprint
Pubblicazione: 2026
Soggetti:
Accesso online:
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866918301340270592
author Vabson, Maria
Zater, Muhy Eddin
Sajadi, Amir
Baker, Kyri
Hodge, Bri-Mathias
author_facet Vabson, Maria
Zater, Muhy Eddin
Sajadi, Amir
Baker, Kyri
Hodge, Bri-Mathias
contents Data centers are growing rapidly, creating the pressing need for the development of critical infrastructure build out to support these resource-intensive large loads. Their immense consumption of electricity and, often, freshwater, continues to stress an already constrained and aging power grid and water resources. This paper presents a comprehensive modeling approach to determine the optimal locations to construct such facilities by quantifying their resource use and minimizing associated costs. The interdisciplinary modeling approach incorporates a number of factors including the power grid, telecommunications, climate, water use, and collocated generation potential. This work establishes the base model whose functionality is shown through several test cases focusing on carbon-free generation collocation on a county-level in the United States. The results suggest that while capital costs are the biggest driver, having a longer future outlook and allowing more variable generation collocation influences the model to choose sites with higher renewable potential.
format Preprint
id arxiv_https___arxiv_org_abs_2601_16315
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Optimal County-Level Siting of Data Centers in the United States
Vabson, Maria
Zater, Muhy Eddin
Sajadi, Amir
Baker, Kyri
Hodge, Bri-Mathias
Systems and Control
Data centers are growing rapidly, creating the pressing need for the development of critical infrastructure build out to support these resource-intensive large loads. Their immense consumption of electricity and, often, freshwater, continues to stress an already constrained and aging power grid and water resources. This paper presents a comprehensive modeling approach to determine the optimal locations to construct such facilities by quantifying their resource use and minimizing associated costs. The interdisciplinary modeling approach incorporates a number of factors including the power grid, telecommunications, climate, water use, and collocated generation potential. This work establishes the base model whose functionality is shown through several test cases focusing on carbon-free generation collocation on a county-level in the United States. The results suggest that while capital costs are the biggest driver, having a longer future outlook and allowing more variable generation collocation influences the model to choose sites with higher renewable potential.
title Optimal County-Level Siting of Data Centers in the United States
topic Systems and Control
url https://arxiv.org/abs/2601.16315