Xiao, J., Wang, Q., Li, Y., Yu, Z., Zhou, H., & Lin, B. (2026). A Fully Automated DM-BIM-BEM Pipeline Enabling Graph-Based Intelligence, Interoperability, and Performance-Driven Early Design.
Chicago Style (17th ed.) CitationXiao, Jun, Qiong Wang, Yihui Li, Zhexuan Yu, Hao Zhou, and Borong Lin. A Fully Automated DM-BIM-BEM Pipeline Enabling Graph-Based Intelligence, Interoperability, and Performance-Driven Early Design. 2026.
MLA (9th ed.) CitationXiao, Jun, et al. A Fully Automated DM-BIM-BEM Pipeline Enabling Graph-Based Intelligence, Interoperability, and Performance-Driven Early Design. 2026.
Warning: These citations may not always be 100% accurate.