Combinatorial Perpetual Scheduling: Existence and Computation of Low-Height Schedules

Fuente: arXiv
Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Mendoza-Cadena, Mirabel, Merino, Arturo, Nielsen, Mads Anker, Schewior, Kevin
Format: Preprint
Veröffentlicht: 2026
Schlagworte:
Online-Zugang:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1866914424024989696
author Mendoza-Cadena, Mirabel
Merino, Arturo
Nielsen, Mads Anker
Schewior, Kevin
author_facet Mendoza-Cadena, Mirabel
Merino, Arturo
Nielsen, Mads Anker
Schewior, Kevin
contents This paper considers a framework for combinatorial variants of perpetual-scheduling problems. Given an independence system $(E,\mathcal{I})$, a schedule consists of an independent set $I_t \in \mathcal{I}$ for every time step $t \in \mathbb{N}$, with the objective of fulfilling frequency requirements on the occurrence of elements in $E$. We focus specifically on combinatorial bamboo garden trimming, where elements accumulate height at growth rates $g(e)$ for $e \in E$ and are reset to zero when scheduled, with the goal of minimizing the maximum height attained by any element. We assume that $g$ is normalized so that it is a convex combination of the incidence vectors of $\mathcal{I}$. Using the integrality of the matroid-intersection polytope, we prove that, when $(E,\mathcal{I})$ is a matroid, it is possible to guarantee a maximum height of at most 2, which is optimal. We complement this existential result with efficient algorithms for specific matroid classes, achieving a maximum height of 2 for uniform and partition matroids, and 4 for graphic and laminar matroids. In contrast, we show that for general independence systems, the optimal guaranteed height is $Θ(\log |E|)$ and can be achieved by an efficient algorithm. For combinatorial pinwheel scheduling, where each element $e\in E$ needs to occur in the schedule at least every $a_e \in \mathbb{N}$ time steps, our results imply bounds on the density sufficient for schedulability.
format Preprint
id arxiv_https___arxiv_org_abs_2602_11826
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Combinatorial Perpetual Scheduling: Existence and Computation of Low-Height Schedules
Mendoza-Cadena, Mirabel
Merino, Arturo
Nielsen, Mads Anker
Schewior, Kevin
Data Structures and Algorithms
This paper considers a framework for combinatorial variants of perpetual-scheduling problems. Given an independence system $(E,\mathcal{I})$, a schedule consists of an independent set $I_t \in \mathcal{I}$ for every time step $t \in \mathbb{N}$, with the objective of fulfilling frequency requirements on the occurrence of elements in $E$. We focus specifically on combinatorial bamboo garden trimming, where elements accumulate height at growth rates $g(e)$ for $e \in E$ and are reset to zero when scheduled, with the goal of minimizing the maximum height attained by any element. We assume that $g$ is normalized so that it is a convex combination of the incidence vectors of $\mathcal{I}$. Using the integrality of the matroid-intersection polytope, we prove that, when $(E,\mathcal{I})$ is a matroid, it is possible to guarantee a maximum height of at most 2, which is optimal. We complement this existential result with efficient algorithms for specific matroid classes, achieving a maximum height of 2 for uniform and partition matroids, and 4 for graphic and laminar matroids. In contrast, we show that for general independence systems, the optimal guaranteed height is $Θ(\log |E|)$ and can be achieved by an efficient algorithm. For combinatorial pinwheel scheduling, where each element $e\in E$ needs to occur in the schedule at least every $a_e \in \mathbb{N}$ time steps, our results imply bounds on the density sufficient for schedulability.
title Combinatorial Perpetual Scheduling: Existence and Computation of Low-Height Schedules
topic Data Structures and Algorithms
url https://arxiv.org/abs/2602.11826