The Complexity Landscape of Two-Stage Robust Selection Problems with Budgeted Uncertainty

Fuente: arXiv
Guardado en:
Detalles Bibliográficos
Autores principales: Goerigk, Marc, Henke, Dorothee, Wulf, Lasse
Formato: Preprint
Publicado: 2026
Materias:
Acceso en línea:
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866910025776103424
author Goerigk, Marc
Henke, Dorothee
Wulf, Lasse
author_facet Goerigk, Marc
Henke, Dorothee
Wulf, Lasse
contents A standard type of uncertainty set in robust optimization is budgeted uncertainty, where an interval of possible values for each parameter is given and the total deviation from their lower bounds is bounded. In the two-stage setting, discrete and continuous budgeted uncertainty have to be distinguished. The complexity of such problems is largely unexplored, in particular if the underlying nominal optimization problem is simple, such as for selection problems. In this paper, we give a comprehensive answer to long-standing open complexity questions for three types of selection problems and three types of budgeted uncertainty sets. In particular, we demonstrate that the two-stage selection problem with continuous budgeted uncertainty is NP-hard, while the corresponding two-stage representative selection problem is solvable in polynomial time. Our hardness result implies that also the two-stage assignment problem with continuous budgeted uncertainty is NP-hard.
format Preprint
id arxiv_https___arxiv_org_abs_2602_16465
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle The Complexity Landscape of Two-Stage Robust Selection Problems with Budgeted Uncertainty
Goerigk, Marc
Henke, Dorothee
Wulf, Lasse
Optimization and Control
Data Structures and Algorithms
90C17, 90C27, 68Q25
A standard type of uncertainty set in robust optimization is budgeted uncertainty, where an interval of possible values for each parameter is given and the total deviation from their lower bounds is bounded. In the two-stage setting, discrete and continuous budgeted uncertainty have to be distinguished. The complexity of such problems is largely unexplored, in particular if the underlying nominal optimization problem is simple, such as for selection problems. In this paper, we give a comprehensive answer to long-standing open complexity questions for three types of selection problems and three types of budgeted uncertainty sets. In particular, we demonstrate that the two-stage selection problem with continuous budgeted uncertainty is NP-hard, while the corresponding two-stage representative selection problem is solvable in polynomial time. Our hardness result implies that also the two-stage assignment problem with continuous budgeted uncertainty is NP-hard.
title The Complexity Landscape of Two-Stage Robust Selection Problems with Budgeted Uncertainty
topic Optimization and Control
Data Structures and Algorithms
90C17, 90C27, 68Q25
url https://arxiv.org/abs/2602.16465