Charging station location planning for electric trucks under demand and grid uncertainty

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Pagnier, Céline, Holen, Tord Gunnar, de Lange, Thomas Haugen, Levin, Patrick, Bakker, Steffen J. S., Schütz, Peter
Format: Preprint
Published: 2026
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866918366333108224
author Pagnier, Céline
Holen, Tord Gunnar
de Lange, Thomas Haugen
Levin, Patrick
Bakker, Steffen J. S.
Schütz, Peter
author_facet Pagnier, Céline
Holen, Tord Gunnar
de Lange, Thomas Haugen
Levin, Patrick
Bakker, Steffen J. S.
Schütz, Peter
contents Decarbonizing long-haul freight requires large-scale deployment of high-power charging infrastructure. This paper studies a multi-period charging station location problem that determines where and when to deploy charging capacity for battery-electric heavy-duty vehicles under uncertain future demand and local grid capacity availability. The problem is formulated as a two-stage stochastic mixed-integer program that maximizes covered electric freight flow. Feasible truck routes are generated a priori using a resource-constrained label-setting algorithm that enforces range limitations and driving-break regulations. To solve large-scale instances, an integer L-shaped decomposition method embedded in a branch-and-cut framework and accelerated by a deterministic warm start is implemented. Computational experiments are conducted on a nationwide Norwegian case study based on real candidate locations provided by a charging station operator. The approach solves instances intractable for a monolithic formulation and achieves near-optimal solutions within practical runtimes. For larger networks, the value of the stochastic solution is substantial, highlighting the importance of explicitly modeling uncertainty in long-term infrastructure planning. Optimal investments prioritize major freight corridors in early periods and subsequently reinforce and expand the network. Grid capacity constraints discourage large, concentrated stations and shift deployments toward more distributed layouts. Covered demand increases rapidly at low budget levels but exhibits diminishing returns as the network approaches saturation.
format Preprint
id arxiv_https___arxiv_org_abs_2603_01782
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Charging station location planning for electric trucks under demand and grid uncertainty
Pagnier, Céline
Holen, Tord Gunnar
de Lange, Thomas Haugen
Levin, Patrick
Bakker, Steffen J. S.
Schütz, Peter
General Economics
Economics
Decarbonizing long-haul freight requires large-scale deployment of high-power charging infrastructure. This paper studies a multi-period charging station location problem that determines where and when to deploy charging capacity for battery-electric heavy-duty vehicles under uncertain future demand and local grid capacity availability. The problem is formulated as a two-stage stochastic mixed-integer program that maximizes covered electric freight flow. Feasible truck routes are generated a priori using a resource-constrained label-setting algorithm that enforces range limitations and driving-break regulations. To solve large-scale instances, an integer L-shaped decomposition method embedded in a branch-and-cut framework and accelerated by a deterministic warm start is implemented. Computational experiments are conducted on a nationwide Norwegian case study based on real candidate locations provided by a charging station operator. The approach solves instances intractable for a monolithic formulation and achieves near-optimal solutions within practical runtimes. For larger networks, the value of the stochastic solution is substantial, highlighting the importance of explicitly modeling uncertainty in long-term infrastructure planning. Optimal investments prioritize major freight corridors in early periods and subsequently reinforce and expand the network. Grid capacity constraints discourage large, concentrated stations and shift deployments toward more distributed layouts. Covered demand increases rapidly at low budget levels but exhibits diminishing returns as the network approaches saturation.
title Charging station location planning for electric trucks under demand and grid uncertainty