Saved in:
Bibliographic Details
Main Authors: Rodríguez-Ballesteros, Sofía, Alcaraz, Javier, Anton-Sanchez, Laura, Goerigk, Marc, Henke, Dorothee
Format: Preprint
Published: 2026
Subjects:
Online Access:https://arxiv.org/abs/2604.15161
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866908970605608960
author Rodríguez-Ballesteros, Sofía
Alcaraz, Javier
Anton-Sanchez, Laura
Goerigk, Marc
Henke, Dorothee
author_facet Rodríguez-Ballesteros, Sofía
Alcaraz, Javier
Anton-Sanchez, Laura
Goerigk, Marc
Henke, Dorothee
contents In this work, we study a single-machine scheduling problem that aims at minimizing the total cost of a schedule subject to start-time dependent costs. This framework naturally captures scenarios where costs fluctuate throughout the day, such as time-varying energy or labor prices. To model more realistic scenarios, we assume that these costs lie within a budgeted uncertainty set and propose a two-stage robust optimization approach. In a first stage, the order in which activities should be executed is decided. After a cost scenario has been revealed, the starting times for each activity are established, subject to the ordering from the first stage. We demonstrate that the proposed problem is NP-hard and not approximable, implying the complexity of its robust counterpart. Furthermore, we show that already evaluating a first-stage solution is NP-hard when the uncertainty set is discrete. We develop models and solution methods for both continuous and discrete budgeted uncertainty. In computational experiments, we compare these approaches and demonstrate the advantages of including uncertainty beforehand.
format Preprint
id arxiv_https___arxiv_org_abs_2604_15161
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle A Robust Optimization Approach for Scheduling with Uncertain Start-Time Dependent Costs
Rodríguez-Ballesteros, Sofía
Alcaraz, Javier
Anton-Sanchez, Laura
Goerigk, Marc
Henke, Dorothee
Optimization and Control
In this work, we study a single-machine scheduling problem that aims at minimizing the total cost of a schedule subject to start-time dependent costs. This framework naturally captures scenarios where costs fluctuate throughout the day, such as time-varying energy or labor prices. To model more realistic scenarios, we assume that these costs lie within a budgeted uncertainty set and propose a two-stage robust optimization approach. In a first stage, the order in which activities should be executed is decided. After a cost scenario has been revealed, the starting times for each activity are established, subject to the ordering from the first stage. We demonstrate that the proposed problem is NP-hard and not approximable, implying the complexity of its robust counterpart. Furthermore, we show that already evaluating a first-stage solution is NP-hard when the uncertainty set is discrete. We develop models and solution methods for both continuous and discrete budgeted uncertainty. In computational experiments, we compare these approaches and demonstrate the advantages of including uncertainty beforehand.
title A Robust Optimization Approach for Scheduling with Uncertain Start-Time Dependent Costs
topic Optimization and Control
url https://arxiv.org/abs/2604.15161