Adaptive mine planning under geological uncertainty: A POMDP framework for sequential decision-making

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Khalifi, Hamza, Caers, Jef, Taha, Yassine, Benzaazoua, Mostafa, Elghali, Abdellatif
Format: Preprint
Published: 2026
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866917492050362368
author Khalifi, Hamza
Caers, Jef
Taha, Yassine
Benzaazoua, Mostafa
Elghali, Abdellatif
author_facet Khalifi, Hamza
Caers, Jef
Taha, Yassine
Benzaazoua, Mostafa
Elghali, Abdellatif
contents Strategic mine production scheduling under geological uncertainty is conventionally formulated as a stochastic optimization problem in which a fixed extraction sequence and routing decisions are computed ex ante. This plan-driven paradigm treats uncertainty as passive: decisions are hedged across geological scenarios, but planning does not anticipate how future observations will inform future decisions. We propose a different perspective by formulating mine scheduling as a Partially Observable Markov Decision Process (POMDP), in which extraction and routing decisions are made sequentially with planning explicitly integrating the expectation of future belief updates. To achieve computational tractability, we introduce a hybrid SA-POMDP architecture that combines simulated annealing-based (SA) value approximation with ensemble-based belief updating via ensemble smoother with multiple data assimilation (ES-MDA). At each decision epoch, candidate actions are evaluated through their expected long-term value under the current belief, and the belief is updated as mining observations are assimilated. This yields an adaptive policy rather than a fixed plan. We evaluate the framework on a copper-gold open-pit mining complex with multiple processing destinations. Under a statistically consistent prior, the SA-POMDP reduces the expectation-reality gap from 22.3% to 4.6%, improving realized NPV by USD8.4M relative to one-shot stochastic optimization. Under systematic prior misspecification of 10%, the adaptive framework outperforms static planning by up to USD44.6M (36.9%), demonstrating structural robustness beyond scenario hedging. These results show that sequential belief updating transforms geological uncertainty from a passive constraint into an active component of value creation.
format Preprint
id arxiv_https___arxiv_org_abs_2605_13702
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Adaptive mine planning under geological uncertainty: A POMDP framework for sequential decision-making
Khalifi, Hamza
Caers, Jef
Taha, Yassine
Benzaazoua, Mostafa
Elghali, Abdellatif
Artificial Intelligence
Strategic mine production scheduling under geological uncertainty is conventionally formulated as a stochastic optimization problem in which a fixed extraction sequence and routing decisions are computed ex ante. This plan-driven paradigm treats uncertainty as passive: decisions are hedged across geological scenarios, but planning does not anticipate how future observations will inform future decisions. We propose a different perspective by formulating mine scheduling as a Partially Observable Markov Decision Process (POMDP), in which extraction and routing decisions are made sequentially with planning explicitly integrating the expectation of future belief updates. To achieve computational tractability, we introduce a hybrid SA-POMDP architecture that combines simulated annealing-based (SA) value approximation with ensemble-based belief updating via ensemble smoother with multiple data assimilation (ES-MDA). At each decision epoch, candidate actions are evaluated through their expected long-term value under the current belief, and the belief is updated as mining observations are assimilated. This yields an adaptive policy rather than a fixed plan. We evaluate the framework on a copper-gold open-pit mining complex with multiple processing destinations. Under a statistically consistent prior, the SA-POMDP reduces the expectation-reality gap from 22.3% to 4.6%, improving realized NPV by USD8.4M relative to one-shot stochastic optimization. Under systematic prior misspecification of 10%, the adaptive framework outperforms static planning by up to USD44.6M (36.9%), demonstrating structural robustness beyond scenario hedging. These results show that sequential belief updating transforms geological uncertainty from a passive constraint into an active component of value creation.
title Adaptive mine planning under geological uncertainty: A POMDP framework for sequential decision-making
topic Artificial Intelligence
url https://arxiv.org/abs/2605.13702