Watts vs. Bytes: Turning Data Centers into Grid Assets via Storage Compute Co-Optimization

Fuente: arXiv
Salvato in:
Dettagli Bibliografici
Autori principali: Liu, Shaohui, Shin, Sungho, Deka, Deepjyoti
Natura: Preprint
Pubblicazione: 2026
Soggetti:
Accesso online:
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1866917500826943488
author Liu, Shaohui
Shin, Sungho
Deka, Deepjyoti
author_facet Liu, Shaohui
Shin, Sungho
Deka, Deepjyoti
contents Enabling continued data-center growth under increasing grid stress motivates closer coordination between flexible computing demand and co-located battery energy storage systems (BESS) to improve site operations and provide grid services. This paper develops a robust co-optimization framework for day-ahead operation of data centers with co-located BESS under utility-imposed interconnection limits on peak load and ramping. The model jointly considers deadline-constrained computing workloads, managed through workload scheduling and dynamic voltage and frequency scaling (DVFS), together with degradation-aware BESS dispatch to enable cost optimization and participation in ancillary-service markets. Case studies based on real-world market and workload data show that the proposed framework yields feasible day-ahead schedules across a range of operating conditions, with substantially larger benefits when interconnection constraints become binding. Under baseline conditions, BESS value is derived from both ancillary-service participation and improved workload and energy management. Under stressed peak-load and ramping limits, however, the daily value of BESS increases by a factor of two or more, driven primarily \revise{by BESS actions to reduce the potential incompletion in the schedulable workload while complying with interconnection constraints}. Under tight peak-load caps, workload composition also matters where a higher share of non-schedulable jobs can increase operating cost by more than 25\% relative to more flexible workload mixes. \revise{Additionally, DVFS studies further show that processor-level control is a material flexibility lever under tight load limits.} These results demonstrate that coordinated compute-storage flexibility can materially expand the operational headroom and grid value of data centers, especially under increasingly scarce grid capacity.
format Preprint
id arxiv_https___arxiv_org_abs_2605_16190
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Watts vs. Bytes: Turning Data Centers into Grid Assets via Storage Compute Co-Optimization
Liu, Shaohui
Shin, Sungho
Deka, Deepjyoti
Systems and Control
Optimization and Control
Enabling continued data-center growth under increasing grid stress motivates closer coordination between flexible computing demand and co-located battery energy storage systems (BESS) to improve site operations and provide grid services. This paper develops a robust co-optimization framework for day-ahead operation of data centers with co-located BESS under utility-imposed interconnection limits on peak load and ramping. The model jointly considers deadline-constrained computing workloads, managed through workload scheduling and dynamic voltage and frequency scaling (DVFS), together with degradation-aware BESS dispatch to enable cost optimization and participation in ancillary-service markets. Case studies based on real-world market and workload data show that the proposed framework yields feasible day-ahead schedules across a range of operating conditions, with substantially larger benefits when interconnection constraints become binding. Under baseline conditions, BESS value is derived from both ancillary-service participation and improved workload and energy management. Under stressed peak-load and ramping limits, however, the daily value of BESS increases by a factor of two or more, driven primarily \revise{by BESS actions to reduce the potential incompletion in the schedulable workload while complying with interconnection constraints}. Under tight peak-load caps, workload composition also matters where a higher share of non-schedulable jobs can increase operating cost by more than 25\% relative to more flexible workload mixes. \revise{Additionally, DVFS studies further show that processor-level control is a material flexibility lever under tight load limits.} These results demonstrate that coordinated compute-storage flexibility can materially expand the operational headroom and grid value of data centers, especially under increasingly scarce grid capacity.
title Watts vs. Bytes: Turning Data Centers into Grid Assets via Storage Compute Co-Optimization
topic Systems and Control
Optimization and Control
url https://arxiv.org/abs/2605.16190