Solving the Aircraft Disassembly Scheduling Problem

Fuente: arXiv
Saved in:
Bibliographic Details
Main Authors: Thomas, Charles, Schaus, Pierre
Format: Preprint
Published: 2026
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866914592128499712
author Thomas, Charles
Schaus, Pierre
author_facet Thomas, Charles
Schaus, Pierre
contents Dismantling aircrafts reaching their end of life is a complex endeavour that is necessary in terms of sustainability but yields small income margins for air transport companies. An efficient scheduling of the disassembly procedure is thus crucial to ensure the profitability of the process and incentivize practice. This is a large scheduling problem that involves thousands of tasks and many different constraints: Extracting parts that are destined to be reused requires technicians with specific certifications and equipment. Extraction operations might be subject to precedence relations. Furthermore, the aircraft must be kept balanced during the whole process. Finally, some of the locations of the aircraft have a limited space that caps the number of technicians able to work there concurrently. This article presents the problem in details and proposes two approaches to solve the problem: a Constraint Programming model and a MIP model. The models are tested on instances of varying sizes involving up to 1450 tasks, which are based on real operational data provided by an industrial partner.
format Preprint
id arxiv_https___arxiv_org_abs_2605_23592
institution arXiv
publishDate 2026
record_format arxiv
spellingShingle Solving the Aircraft Disassembly Scheduling Problem
Thomas, Charles
Schaus, Pierre
Artificial Intelligence
Dismantling aircrafts reaching their end of life is a complex endeavour that is necessary in terms of sustainability but yields small income margins for air transport companies. An efficient scheduling of the disassembly procedure is thus crucial to ensure the profitability of the process and incentivize practice. This is a large scheduling problem that involves thousands of tasks and many different constraints: Extracting parts that are destined to be reused requires technicians with specific certifications and equipment. Extraction operations might be subject to precedence relations. Furthermore, the aircraft must be kept balanced during the whole process. Finally, some of the locations of the aircraft have a limited space that caps the number of technicians able to work there concurrently. This article presents the problem in details and proposes two approaches to solve the problem: a Constraint Programming model and a MIP model. The models are tested on instances of varying sizes involving up to 1450 tasks, which are based on real operational data provided by an industrial partner.
title Solving the Aircraft Disassembly Scheduling Problem
topic Artificial Intelligence
url https://arxiv.org/abs/2605.23592