contents ANYLTS' Cost Projections and Suggested Phase-In Schedules; A Report to the Board of Trustees. Books Centralization Cost Estimates Facilities Library Expenditures Library Technical Processes Program Costs Public Libraries This report, along with the separate report by Drake Sheahan/Stewart Dougall Consultants entitled: "Book Processing Facility Design" available as LI 001 919, should clear up two unfounded assumptions that (1) the actual processing of 2,500,000 volumes cannot be done at one location and (2) the printing times required are too unrealistic to be handled on the computer peripheral equipment. The Drake Sheahan/Stewart Dougall report indicates that 2,500,000 volumes can be processed more efficiently in one location than is now being done in 19 different locations or than could be done in 6 different locations. Cost projections in this document are based on data in that report. Estimates of computer print-times indicate that all the reports which must be handled, as well as all the cards which must be produced, are well within the capability of the equipment contemplated. The assumptions and methodology used to project unit costs are included. (NH)
format Recurso educativo Open Access
id eric_ED039007
institution ERIC Institute of Education Sciences
language en
publishDate 1969
record_format eric
spellingShingle ANYLTS' Cost Projections and Suggested Phase-In Schedules; A Report to the Board of Trustees.
Books
Centralization
Cost Estimates
Facilities
Library Expenditures
Library Technical Processes
Program Costs
Public Libraries
ANYLTS' Cost Projections and Suggested Phase-In Schedules; A Report to the Board of Trustees. Books Centralization Cost Estimates Facilities Library Expenditures Library Technical Processes Program Costs Public Libraries This report, along with the separate report by Drake Sheahan/Stewart Dougall Consultants entitled: "Book Processing Facility Design" available as LI 001 919, should clear up two unfounded assumptions that (1) the actual processing of 2,500,000 volumes cannot be done at one location and (2) the printing times required are too unrealistic to be handled on the computer peripheral equipment. The Drake Sheahan/Stewart Dougall report indicates that 2,500,000 volumes can be processed more efficiently in one location than is now being done in 19 different locations or than could be done in 6 different locations. Cost projections in this document are based on data in that report. Estimates of computer print-times indicate that all the reports which must be handled, as well as all the cards which must be produced, are well within the capability of the equipment contemplated. The assumptions and methodology used to project unit costs are included. (NH)
title ANYLTS' Cost Projections and Suggested Phase-In Schedules; A Report to the Board of Trustees.