Main Author: Rómel Gilberto Solís-Carcaño
Format: Artículo científico
Language:en
Published: Universidad Nacional Autónoma de México 2017
Subjects:
Online Access:https://www.redalyc.org/articulo.oa?id=40453343006
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866814199898832896
author Rómel Gilberto Solís-Carcaño
author_facet Rómel Gilberto Solís-Carcaño
contents Time and cost control in construction projects in southeast Mexico Rómel Gilberto Solís-Carcaño Carmen Sarahí Morfín-García Jesús Nicolás Zaragoza-Grifé Ingeniería control predictors Construction earned value earned schedule Monitoring time and costs has been traditionally served as a basis for control of construction projects; this is because one of the main causes of legal conflicts derived from a construction contract is the breach on delivery time of the pro - ject, and because the main goal of a construction firm is to get a profit that it considers appropriate. In the late nineteenth century, Frederick Taylor laid the foundations in order to ascending the management to the category of science, and through engineering techniques he changed the paradigms of productivity in industry. After several decades of re - search on project management the Earned Value technique was developed, which allowed control the execution of a project through its budget and its schedule; and in the early twenty-first century took another step in how to make a project assessment for performance of time, through Earned Schedule technique. The aim of this study was to evaluate the effectiveness of two project management methods: Earned Schedule and Earned Value; to control the time and cost in construction projects executed in Mexico. For achieving this, time and cost performance indicators and predictors from six projects were calculated. Results showed better performance in projects using the method of Earned Schedule to control the time; and independence between the performance indicators of time and cost. 2017 artículo científico 1405-7743 https://www.redalyc.org/articulo.oa?id=40453343006 en http://www.redalyc.org/revista.oa?id=404 Ingeniería. Investigación y Tecnología application/pdf Universidad Nacional Autónoma de México Ingeniería. Investigación y Tecnología (México) Num.4 Vol.XVIII
format Artículo científico
id redalyc_40453343006
language en
publishDate 2017
publisher Universidad Nacional Autónoma de México
spellingShingle Time and cost control in construction projects in southeast Mexico
Rómel Gilberto Solís-Carcaño
Ingeniería
control
predictors
Construction
earned value
earned schedule
Time and cost control in construction projects in southeast Mexico Rómel Gilberto Solís-Carcaño Carmen Sarahí Morfín-García Jesús Nicolás Zaragoza-Grifé Ingeniería control predictors Construction earned value earned schedule Monitoring time and costs has been traditionally served as a basis for control of construction projects; this is because one of the main causes of legal conflicts derived from a construction contract is the breach on delivery time of the pro - ject, and because the main goal of a construction firm is to get a profit that it considers appropriate. In the late nineteenth century, Frederick Taylor laid the foundations in order to ascending the management to the category of science, and through engineering techniques he changed the paradigms of productivity in industry. After several decades of re - search on project management the Earned Value technique was developed, which allowed control the execution of a project through its budget and its schedule; and in the early twenty-first century took another step in how to make a project assessment for performance of time, through Earned Schedule technique. The aim of this study was to evaluate the effectiveness of two project management methods: Earned Schedule and Earned Value; to control the time and cost in construction projects executed in Mexico. For achieving this, time and cost performance indicators and predictors from six projects were calculated. Results showed better performance in projects using the method of Earned Schedule to control the time; and independence between the performance indicators of time and cost. 2017 artículo científico 1405-7743 https://www.redalyc.org/articulo.oa?id=40453343006 en http://www.redalyc.org/revista.oa?id=404 Ingeniería. Investigación y Tecnología application/pdf Universidad Nacional Autónoma de México Ingeniería. Investigación y Tecnología (México) Num.4 Vol.XVIII
title Time and cost control in construction projects in southeast Mexico