Skip to content
Universidad del Mar SIBUMAR Descubridor Institucional UMAR
  • Inicio
  • Búsqueda avanzada
  • Explorar
  • Login
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
Advanced
  • Alinear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
Cover Image

Alinear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill

Fuente: Redalyc
Saved in:
Bibliographic Details
Main Author: Nayaret Cifuentes
Format: Artículo científico
Language:en
Published: Universidad Pedagógica y Tecnológica de Colombia 2017
Subjects:
Ingeniería
Parameterization
Parallel machines
Scheduling of the production
Online Access:
Acceder al recurso 1 Acceder al recurso 2 Acceder al recurso 3 Acceder al recurso 4 Acceder al recurso 5
Tags: Add Tag
No Tags, Be the first to tag this record!
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Save to List
  • Permanent link
  • Holdings
  • Description
  • Comments
  • Similar Items
  • Staff View

Internet

https://www.redalyc.org/articulo.oa?id=413955461001
https://www.redalyc.org/journal/4139/413955461001/
https://www.redalyc.org/journal/4139/413955461001/html/
https://www.redalyc.org/journal/4139/413955461001/413955461001.epub
https://www.redalyc.org/journal/4139/413955461001/movil

Similar Items

  • A genetic algorithm and variable neighborhood search for the unrelated parallel machine scheduling problem with sequence dependent setup time
    by: Everton Tozzo
    Published: (2018)
  • Un algoritmo eficiente para problemas single machine con tiempos de procesamiento difusos
    by: Edwin Lazo Eche
    Published: (2016)
  • Inheritance, Generics and Binary Methods in Java
    by: María Lucía Barrón Estrada
    Published: (2003)
  • Flowshop scheduling with machine deterioration based on job sequences
    by: Alex J. Ruiz-Torres
    Published: (2021)
  • Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules
    by: Antonio Lova
    Published: (2006)
Universidad del Mar
Universidad del MarSistema Bibliotecario de la Universidad del MarDescubridor Institucional UMARImplementación y desarrollo: Mtro. Carlos Alonso Albores Pérez
InicioBúsqueda avanzadaExplorar
Visitas al Descubridor: 387,319© 2026 Universidad del Mar