Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Alejandro Castillo-Ramírez
Format: Artículo científico
Sprache:en
Veröffentlicht: ECOPETROL S.A. 2017
Schlagworte:
Online-Zugang:https://www.redalyc.org/articulo.oa?id=46553766008
https://www.redalyc.org/journal/465/46553766008/
https://www.redalyc.org/journal/465/46553766008/html/
https://www.redalyc.org/journal/465/46553766008/46553766008.epub
https://www.redalyc.org/journal/465/46553766008/movil
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Inhaltsangabe:
  • LARGE-SCALE SOLAR PV LCOE COMPREHENSIVE BREAKDOWN METHODOLOGY Alejandro Castillo-Ramírez Diego Mejía-Giraldo Nicolás Muñoz-Galeano Ingeniería WACC Large Incentives LCOE breakdown Investment Costs This paper presents a breakdown cost methodology to evaluate Levelized Costs of Electricity for large-scale Photovoltaic (PV) plants. The breakdown is based on a comprehensive taxonomy to evaluate Investment Costs (IC) and Operation and Maintenance (O&M) expenditures. We added an IC disaggregation level, called elements, on top of the five-component breakdown of the Energy Information Administration (EIA). In addition, a novel structure for disaggregating O&M costs is also proposed. The methodology is evaluated over a 20-MW and a 150-MW PV power plant hypothetically placed in the municipality of Uribia (Guajira Colombia). Also deterministic sensitivity analysis based on discount rate (WACC, Weighted Average Capital Cost), energy generated, O&M costs and IC is performed to aid investors in their decisions. 2017 artículo científico 0122-5383 https://www.redalyc.org/articulo.oa?id=46553766008 https://www.redalyc.org/journal/465/46553766008/ https://www.redalyc.org/journal/465/46553766008/html/ https://www.redalyc.org/journal/465/46553766008/46553766008.epub https://www.redalyc.org/journal/465/46553766008/movil en http://www.redalyc.org/revista.oa?id=465 CT&F Ciencia, Tecnología y Futuro application/pdf ECOPETROL S.A. CT&F Ciencia, Tecnología y Futuro (Colombia) Num.1 Vol.7