Occupational hazards and economic indicators in the scheduling of a make-to-order system
Fuente:
Redalyc
Salvato in:
| Autore principale: | |
|---|---|
| Natura: | Artículo científico |
| Lingua: | en |
| Pubblicazione: |
Universidad Nacional de Colombia
2023
|
| Soggetti: | |
| Accesso online: | |
| Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
| _version_ | 1876454473850683392 |
|---|---|
| author | Germán Coca-Ortegón |
| author_facet | Germán Coca-Ortegón |
| contents | Occupational hazards and economic indicators in the scheduling of a make-to-order system Germán Coca-Ortegón Ingeniería Multi objective sustainability Metric indicator economic indicators This paper examines some specific occupational hazards and certain economic indicators of sustainability in a make-to-order manufacturing system. In this respect, two multi-objective protocols are structured. The first is a redesigned genetic algorithm; the second is based on normalized summations. The comparison establishes that the former outperforms the latter by 528%, concerning to the "C-Metric" indicator. 2023 artículo científico 0012-7353 https://www.redalyc.org/articulo.oa?id=49677770013 https://www.redalyc.org/journal/496/49677770013/ https://www.redalyc.org/journal/496/49677770013/html/ https://www.redalyc.org/journal/496/49677770013/49677770013.epub https://www.redalyc.org/journal/496/49677770013/movil https://doi.org/10.15446/dyna.v90n227.107105 en http://www.redalyc.org/revista.oa?id=496 Dyna application/pdf Universidad Nacional de Colombia Dyna (Colombia) Num.227 Vol.90 |
| format | Artículo científico |
| id | redalyc_49677770013 |
| institution | Redalyc |
| language | en |
| publishDate | 2023 |
| publisher | Universidad Nacional de Colombia |
| spellingShingle | Occupational hazards and economic indicators in the scheduling of a make-to-order system Germán Coca-Ortegón Ingeniería Multi objective sustainability Metric indicator economic indicators Occupational hazards and economic indicators in the scheduling of a make-to-order system Germán Coca-Ortegón Ingeniería Multi objective sustainability Metric indicator economic indicators This paper examines some specific occupational hazards and certain economic indicators of sustainability in a make-to-order manufacturing system. In this respect, two multi-objective protocols are structured. The first is a redesigned genetic algorithm; the second is based on normalized summations. The comparison establishes that the former outperforms the latter by 528%, concerning to the "C-Metric" indicator. 2023 artículo científico 0012-7353 https://www.redalyc.org/articulo.oa?id=49677770013 https://www.redalyc.org/journal/496/49677770013/ https://www.redalyc.org/journal/496/49677770013/html/ https://www.redalyc.org/journal/496/49677770013/49677770013.epub https://www.redalyc.org/journal/496/49677770013/movil https://doi.org/10.15446/dyna.v90n227.107105 en http://www.redalyc.org/revista.oa?id=496 Dyna application/pdf Universidad Nacional de Colombia Dyna (Colombia) Num.227 Vol.90 |
| title | Occupational hazards and economic indicators in the scheduling of a make-to-order system |
| topic | Ingeniería Multi objective sustainability Metric indicator economic indicators |
| url | https://www.redalyc.org/articulo.oa?id=49677770013 https://www.redalyc.org/journal/496/49677770013/ https://www.redalyc.org/journal/496/49677770013/html/ https://www.redalyc.org/journal/496/49677770013/49677770013.epub https://www.redalyc.org/journal/496/49677770013/movil https://doi.org/10.15446/dyna.v90n227.107105 |