Research on double deck beam closure construction based on hanging beam on arch technology

Fuente: Wiley Open Access
Saved in:
Bibliographic Details
Main Authors: Yexun Li, Laifa Wang, Qianqian Liang
Format: Artículo Open Access
Published: Wiley 2025
Subjects:
Online Access:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867011492930387968
author Yexun Li
Laifa Wang
Qianqian Liang
author_facet Yexun Li
Laifa Wang
Qianqian Liang
Yexun Li
Laifa Wang
Qianqian Liang
collection Wiley Open Access
contents Research on double deck beam closure construction based on hanging beam on arch technology Yexun Li Laifa Wang Qianqian Liang ce/papers AbstractThis paper established the construction calculation model of the whole bridge through Midas Civil software, and analyzed the mechanical response of the whole and horizontal cables in the construction process in detail. It verified the feasibility and safety of the construction process of “lifting beams on the arch and lifting the bridge deck as a whole in double decks”. The monitoring method, the deviation adjustment technology of the closure opening and the fine‐tuning strategy of the top pulling device were proposed to ensure the accuracy of the closure during the bridge deck closure construction of Qingshuitang Bridge. 10.1002/cepa.3208 http://onlinelibrary.wiley.com/termsAndConditions#vor
doi_str_mv 10.1002/cepa.3208
format Artículo Open Access
id wiley_oa_10_1002_cepa_3208
institution Wiley Open Access
license_str_mv http://onlinelibrary.wiley.com/termsAndConditions#vor
publishDate 2025
publisher Wiley
record_format wiley_oa
spellingShingle Research on double deck beam closure construction based on hanging beam on arch technology
Yexun Li
Laifa Wang
Qianqian Liang
ce/papers
Research on double deck beam closure construction based on hanging beam on arch technology Yexun Li Laifa Wang Qianqian Liang ce/papers AbstractThis paper established the construction calculation model of the whole bridge through Midas Civil software, and analyzed the mechanical response of the whole and horizontal cables in the construction process in detail. It verified the feasibility and safety of the construction process of “lifting beams on the arch and lifting the bridge deck as a whole in double decks”. The monitoring method, the deviation adjustment technology of the closure opening and the fine‐tuning strategy of the top pulling device were proposed to ensure the accuracy of the closure during the bridge deck closure construction of Qingshuitang Bridge. 10.1002/cepa.3208 http://onlinelibrary.wiley.com/termsAndConditions#vor
title Research on double deck beam closure construction based on hanging beam on arch technology
topic ce/papers
url https://onlinelibrary.wiley.com/doi/10.1002/cepa.3208