Enregistré dans:
Détails bibliographiques
Auteurs principaux: Gül Gündüz Mengübaş, Kenneth Sörensen, Muhammed Kotan
Format: Artículo Open Access
Publié: Wiley 2024
Sujets:
Accès en ligne:https://onlinelibrary.wiley.com/doi/10.1111/itor.13596
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
Table des matières:
  • Conflict‐free tow train routing in just‐in‐time assembly lines Gül Gündüz Mengübaş Kenneth Sörensen Muhammed Kotan International Transactions in Operational Research AbstractConflicts among tow trains pose a significant challenge in just‐in‐time manufacturing systems, impacting both safety and efficiency. This paper proposes an innovative solution to achieve conflict‐free tow train routing. In our approach, the production layout is partitioned into “pixels.” The A‐star (A*) algorithm is then employed on this pixel‐based layout to create a distance matrix between workstations. Subsequently, a simulated annealing heuristic optimizes tow train routes to deliver parts demanded at the workstations. Additionally, a conflict detection algorithm identifies collisions among tow trains on the pixel layout, which are then resolved through two distinct conflict avoidance strategies. The algorithms are implemented and tested on a set of benchmark instances, demonstrating their effectiveness. 10.1111/itor.13596 http://onlinelibrary.wiley.com/termsAndConditions#vor