Skip to content
VuFind
  • Login
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
Advanced
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Save to List
  • Permanent link
Cover Image

Saved in:
Bibliographic Details
Main Authors: Diego G. Coelho, Marcone J. F. Souza, Luciano P. Cota
Format: Artículo Open Access
Published: Wiley 2025
Subjects:
International Transactions in Operational Research
Online Access:https://onlinelibrary.wiley.com/doi/10.1111/itor.70021
Tags: Add Tag
No Tags, Be the first to tag this record!
  • Holdings
  • Description
  • Table of Contents
  • Comments
  • Similar Items
  • Staff View
Description
DOI:10.1111/itor.70021

Similar Items

  • A genetic algorithm simheuristic for solving the stochastic project portfolio selection problem with portfolio reliability constraints
    by: Miguel Saiz, et al.
    Published: (2025)
  • A fast local search for the identical parallel machine scheduling problem with the position‐based deteriorating effect and maintenance
    by: Radosław Rudek
    Published: (2025)
  • Exact resolution of a simultaneous vehicle routing and crew scheduling problem in long‐haul transport
    by: Mauro Lucci, et al.
    Published: (2025)
  • Optimizing plastic product manufacturing scheduling: an integrated approach to minimize setup costs and tardiness with preventive maintenance considerations
    by: Zhaohui Li, et al.
    Published: (2025)
  • Multi‐neighborhood simulated annealing for the home healthcare routing and scheduling problem
    by: Sara Ceschia, et al.
    Published: (2024)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Explore Channels
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs