Slopes with cemented berms - Numerical models in PLAXIS2D

Fuente: Zenodo
Guardado en:
Detalles Bibliográficos
Autores principales: Ribeiro, Leonardo, Midão, Celso, Rios, Sara
Formato: Recurso digital
Publicado: Zenodo 2025
Materias:
Acceso en línea:
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1866902248213184512
author Ribeiro, Leonardo
Midão, Celso
Rios, Sara
author_facet Ribeiro, Leonardo
Midão, Celso
Rios, Sara
contents <p>This folder comprises finite element numerical models built in PLAXIS 2D (R) using CASM (Clay and Sand Model) and Mohr-Coulomb constitutive models, in drained and undrained conditions. As mentioned in the Read me file the model comprises drained and undrained analyses. </p> <p>Drained: Following the main branch of the phasing, a drained analysis is made by raising the model by 5m with the Mohr-Coulomb constitutive model and having an additional phase to switch this new cluster into CASM.</p> <p>Undrained: For each 5m raising, a branch phase with the materials in undrained conditions is made. Although the 30m phase was able to reach the end of the calculations, it showed such great displacements that a failure can be assumed.</p>
format Recurso digital
id zenodo_https___doi_org_10_5281_zenodo_15097464
institution Zenodo
language
publishDate 2025
publisher Zenodo
record_format zenodo
spellingShingle Slopes with cemented berms - Numerical models in PLAXIS2D
Ribeiro, Leonardo
Midão, Celso
Rios, Sara
PLAXIS2D
slope stability
CASM
cemented materials
<p>This folder comprises finite element numerical models built in PLAXIS 2D (R) using CASM (Clay and Sand Model) and Mohr-Coulomb constitutive models, in drained and undrained conditions. As mentioned in the Read me file the model comprises drained and undrained analyses. </p> <p>Drained: Following the main branch of the phasing, a drained analysis is made by raising the model by 5m with the Mohr-Coulomb constitutive model and having an additional phase to switch this new cluster into CASM.</p> <p>Undrained: For each 5m raising, a branch phase with the materials in undrained conditions is made. Although the 30m phase was able to reach the end of the calculations, it showed such great displacements that a failure can be assumed.</p>
title Slopes with cemented berms - Numerical models in PLAXIS2D
topic PLAXIS2D
slope stability
CASM
cemented materials
url https://doi.org/10.5281/zenodo.15097464